
Procedure
1. Prepare ferrules for the wires that are mentioned below. Refer to section
2. Connect the below listed wires from the outlets. Use the illustration above as a
reference:
Outlet
Wire
Connect to terminal Terminal name
1
(A) 24V DC
X4-1
+24Vdc CP1
(B) 0V DC
X4-2
0Vdc gnd CP1
2
(C) 24V DC
X5-1
+24Vdc CP2
(D) 0V DC
X5-2
0Vdc gnd CP2
3
(E) 24V DC
X6-1
+24Vdc CP3
(F)0V DC
X6-2
0Vdc gnd CP3
4
(G) 24V DC
X7-1
+24Vdc CP4
(H)0V DC
X7-2
0Vdc gnd CP4
6.3.8
Connect the interlock and DC guard cables to the power cabinet
Preliminary requirements
•
Interlock and DC guard
cables. Refer to section
•
TO
P
BO
T
TO
P
BO
T
TO
P
BO
T
1
1
2
2
3
3
4
4
5
5
6
6
RJ45
TO
P
B
O
T
TO
P
B
O
T
TO
P
B
O
T
1
1
2
2
3
3
4
4
5
5
6
6
RJ45
TO
P
BO
T
TO
P
BO
T
TO
P
BO
T
1
1
2
2
3
3
4
4
5
5
6
6
RJ45
TO
P
B
O
T
TO
P
B
O
T
TO
P
B
O
T
1
1
2
2
3
3
4
4
5
5
6
6
RJ45
+2
4
Vd
c
C
P1
0
V
g
n
d
C
P1
+2
4
Vd
c
C
P2
0
V
g
n
d
C
P2
+2
4
Vd
c
C
P3
0
V
g
n
d
C
P3
+2
4
Vd
c
C
P4
0
V
g
n
d
C
P4
-X4
-X5
-X6
-X7
A
B
C
D
E
F
G
H
Installation
48
HVC 200/300/360-EN | 002
Содержание HVC 200
Страница 1: ...Operation and installation manual HVC 200 300 360 UL Copyright ABB All rights reserved...
Страница 67: ...Maintenance and cleaning HVC 200 300 360 EN 002 67...
Страница 91: ...Technical data HVC 200 300 360 EN 002 91...
Страница 92: ......