
Procedure
1. Carefully lower the cabinet on the
foundation with a hoisting equipment
or a forklift truck.
Caution: Make sure that there
is no kink in the cables.
2. Make sure that the holes in the cabinet
(A) and the foundation (B) are aligned.
Caution: Install a cabinet with
only 3 three screws when
there is no access to the rear
corner of a cabinet. This occurs
when 4 or more cabinets are
installed..
3. Install the fasteners (C) and the washers.
4. Tighten the fasteners to the correct torque. For the specification, refer to
section
6.2.3
Install the cover plates of the metal foundation
Preliminary requirements
•
The cabinet is installed on
the foundation.
•
16 fasteners M6 (included in
the foundation kit)
Procedure
1. Install the cover plates (A).
2. Install the fasteners (B).
3. Tighten the fasteners to the correct
torque. For the specification, refer to
section
A
C
B
A
B
Installation
40
HVC 200/300/360-EN | 002
Содержание HVC 200
Страница 1: ...Operation and installation manual HVC 200 300 360 UL Copyright ABB All rights reserved...
Страница 67: ...Maintenance and cleaning HVC 200 300 360 EN 002 67...
Страница 91: ...Technical data HVC 200 300 360 EN 002 91...
Страница 92: ......