
6
Installation
6.1
Install the power cabinet - general procedure
Preliminary requirements
•
The site is prepared.
Note: For the installation of the whole system (power cabinet and
charging posts), refer to the installation brief, the installation drawing
and the installation manuals of the devices that are installed in the
charging system you ordered.
Procedure
1. Prepare the foundation for the power cabinet. Refer to section
.
2. Unpack the power cabinet. Refer to section
.
3. Do the mechanical installation of the power cabinet. Refer to section
4. Do the electrical installation of the power cabinet. Refer to section
.
6.2
Mechanical installation
6.2.1
Mechanical installation of the power cabinet - general procedure
Preliminary requirements
•
The cabinet is above the foundation.
Procedure
1. Remove the plinth covers of the power cabinet. Refer to section
2. Install the cabinet on the foundation. Refer to section
3. Install the cover plate of the foundation. Refer to section
.
4. Install the plinth covers of the power cabinet. Refer to section
6.2.2
Install the cabinet on the foundation
Preliminary requirements
•
Hoisting equipment or
forklift truck
•
Torque wrench
•
Four fasteners M16 and
washers
Installation
HVC 200/300/360-EN | 002
39
Содержание HVC 200
Страница 1: ...Operation and installation manual HVC 200 300 360 UL Copyright ABB All rights reserved...
Страница 67: ...Maintenance and cleaning HVC 200 300 360 EN 002 67...
Страница 91: ...Technical data HVC 200 300 360 EN 002 91...
Страница 92: ......