Installation
18 - EN
ProcessMaster / HygienicMaster
CI/FEP300/FEH300-EN
3.5.3 Metal pipe with loose flanges
1.
Solder the threaded nuts M6 (1) to the pipeline and connect the ground as shown in the
illustration.
2.
Use a copper wire (at least 2.5 mm² (14 AWG)) to establish the ground connection between
the sensor (2) and an appropriate grounding point.
Flange design
Wafer type design
Fig. 20
3.5.4 Non-metallic pipes or pipes with insulating liner
For plastic pipes or pipes with insulating lining, the ground is provided by the grounding plate as
shown in the figure below or via grounding electrodes that must be installed in the device
(option). If grounding electrodes are used, the grounding plate is not necessary.
1.
Install the flowmeter sensor with grounding plate (3) in the pipeline.
2.
Connect the terminal plug (2) for the grounding plate (3) and ground connection (1) on the
flowmeter sensor with the grounding strap.
3.
Use a copper wire (at least 2.5 mm² (14 AWG)) to connect between the ground connection
(1) and an appropriate grounding point.
Flange design
Wafer type design
Fig. 21
Содержание HART FEH300
Страница 2: ......
Страница 39: ...Appendix CI FEP300 FEH300 EN ProcessMaster HygienicMaster EN 37 ...
Страница 40: ...Appendix 38 EN ProcessMaster HygienicMaster CI FEP300 FEH300 EN ...
Страница 41: ......