Start-up 59
3. Create or modify the connection settings to reflect the serial
connection to the PLC. Then, on the
Serial
tab, right-click the
connection and click
Connect
.
4. On the
File
menu, click
New Project...
to create a new project
for your PLC, or click
Open Project...
to open an existing
project.
For more information on creating a project, see the B&R
documentation.
Содержание FEPL-02 Ethernet POWERLINK
Страница 4: ......
Страница 10: ...10 Table of contents ...
Страница 20: ...20 About the manual ...
Страница 28: ...28 Mechanical installation ...
Страница 63: ...Start up 63 2 To add the adapter module right click the IF3 list entry and then click Insert ...
Страница 69: ...Start up 69 3 In the Project transfer dialog box click OK 4 Wait for the transfer to finish ...
Страница 70: ...70 Start up When the transfer is finished the PLC starts up in the RUN mode ...
Страница 90: ...90 Communication profiles ...
Страница 100: ...100 Communication protocol ...
Страница 104: ...104 Diagnostics ...
Страница 108: ...108 Technical data ...
Страница 140: ...140 Appendix C IdentResponse Frame ...