Quick installation, commissioning and operation flowchart
See
Task
Plan the installation. Check: ambient conditions, ratings,
required external cooling circuit arrangements, compat-
ibility of the generator, power cable connection, etc.
Planning the electrical installation (page 49)
Option manuals (if optional equipment is included)
Select the cables.
Checklist before mechanical installation (page 42)
Unpack and check the equipment.
Check the type code indicated on the type designation
label against the original order.
Check that all necessary option modules and equipment
are present and correct.
Only intact converters may be started up!
Checklist before mechanical installation (page 42)
Check the installation site.
Route the cables.
Mechanical installation (page 41)
Move the converter to the installation site and attach it
to the floor.
Cooling and heating (page 115)
Connect an external cooling circuit to the converter.
Checking the insulation of the assembly (page 61)
Check the insulation of the generator and the generator
cable.
Electrical installation (page 61)
Connect the power cables. Connect the control and the
auxiliary control cables.
Installation checklist (page 67)
Check the installation.
Firmware manual
Commission the converter.
24 Introduction to the manual
Содержание ACS880-77CC
Страница 1: ...ABB WIND TURBINE CONVERTERS ACS880 77CC wind turbine converters Hardware manual...
Страница 2: ......
Страница 4: ......
Страница 10: ...10...
Страница 17: ...5 1 3 4 6 8 7 2 Safety instructions 17...
Страница 22: ...22...
Страница 40: ...40...
Страница 60: ...60...
Страница 73: ...2a 3b 4c 5 Air flow direction is towards the converter module Maintenance 73...
Страница 104: ...104...
Страница 108: ...Description CAN bus connection XCAN XCAN 108 BCU x5 control unit...
Страница 112: ...112 Dimension drawings...
Страница 113: ...Dimension drawings 113...
Страница 114: ...114 Dimension drawings...
Страница 126: ...126...