Installation checklist 27
6
Installation checklist
Contents of this chapter
Finish installation checklist before commissioning.
Checklist
Go through the checklist together with another person.
Mechanical installation
1. Ambient operating conditions meet the specifications given in chapter
Technical data
2. Drive installed according to the instructions in this manual (Chapters
Mechanical installation
and
Electrical installation
)
3. Drive securely fastened to the floor
4. Fan units installed
5. Visual
inspection:
no badly affixed or damaged components
no foreign objects inside cabinet
no dirt, dust and humidity inside cabinet
Содержание ACS580MV
Страница 1: ...ABB industrial drives ACS580MV Quick guide...
Страница 4: ......
Страница 8: ...8 Safety instructions...
Страница 12: ...12 Lifting and transportation...
Страница 21: ...Electrical installation 21 2 2 3 1 1...
Страница 40: ...40 Fault tracing...
Страница 44: ...www abb com drives www abb com drivespartners 2UBB019170 E01 Rev A EN 2018 03 15 Contact us...