Installation checklist 29
Motor
Insulation tests
Power supply
4.
MCB interposing relay settings tested
5.
Safety devices checked and in operation
1.
Motor installed, aligned and alignment protocol available
2.
Motor decoupled from driven load
3. Ground
connection
completed
4.
Customer side motor protection set and ready (e.g. winding temperature, vibration)
5.
Motor auxiliaries (e.g. bearing lubrication, heater cooling) ready
1. All power cables to drive, and from drive to motor are meggered, and measured values are
within the required limits.
2. Test report of the megger test available
Note:
If the test is carried out by the commissioning engineer of the drive, an additional day per
drive motor combination needs to be reserved. After the test, the feeder cables can be
connected, except at the drive end. The test must comply with the specification.
3. Optional insulation tests of the drive are completed and documented. Insulation tests of the
drive recommended in case: long storage time (>4 months), humid environment or visible
damages due to transportation/installation.
1. Medium voltage available for start-up of drive
2. Low voltage auxiliary power available for start-up of drive
Содержание ACS580MV
Страница 1: ...ABB industrial drives ACS580MV Quick guide...
Страница 4: ......
Страница 8: ...8 Safety instructions...
Страница 12: ...12 Lifting and transportation...
Страница 21: ...Electrical installation 21 2 2 3 1 1...
Страница 40: ...40 Fault tracing...
Страница 44: ...www abb com drives www abb com drivespartners 2UBB019170 E01 Rev A EN 2018 03 15 Contact us...