Electrical installation 23
Connect the cables to their corresponding busbars. Use cable lugs suitable for M12 bolts.
The required tightening torque is 40 Nm.
•
Feeder cables to busbars U1, V1, W1
•
Motor cables to busbars U2, V2, W2
•
Screen ends of all conductors and the shields of all cables to the PE ground
busbar
•
Ground cable to the PE ground busbar
Terminal compartment with cover plate removed, view from front.
1
Voltage dividers
2
Motor side terminals
3
Input terminals
4
Cable entry plate (bottom plate)
1
2
3
4
Содержание ACS580MV
Страница 1: ...ABB industrial drives ACS580MV Quick guide...
Страница 4: ......
Страница 8: ...8 Safety instructions...
Страница 12: ...12 Lifting and transportation...
Страница 21: ...Electrical installation 21 2 2 3 1 1...
Страница 40: ...40 Fault tracing...
Страница 44: ...www abb com drives www abb com drivespartners 2UBB019170 E01 Rev A EN 2018 03 15 Contact us...