121
ACS2000 AFE 2MVA UM
3BHS355653 ZAB E01 REV. H
—
Insulation tests
Power supply
Miscellaneous
1.
All power cables to input transformer, between input transformer and drive, and from drive to motor mea-
sured, measured values within the required limits.
2.
Test report of the megger test available
—
If the test is carried out by the commissioning engineer of the drive, an
additional day per drive motor combination needs to be reserved.
After the test, the feeder cables can be connected, except at the drive
end. The test must comply with the specification.
1.
Medium voltage available for the start-up of the drive
2.
Low voltage auxiliary power available for the start-up of the drive
1.
Sufficient number and correct type of spare parts are available
2.
Air conditioning of drive room ready for the load run of drive
3.
Optional equipment ready
Содержание ACS2000 AFE 2MVA
Страница 8: ...General information on manual and equipment ...
Страница 13: ...13 ACS2000 AFE 2MVA UM 3BHS355653 ZAB E01 REV H ...
Страница 14: ...Terms abbreviations trademarks ...
Страница 19: ...19 ACS2000 AFE 2MVA UM 3BHS355653 ZAB E01 REV H ...
Страница 20: ...Important note on main circuit breaker ...
Страница 48: ...Chapter 3 Control system 49 Control unit 50 Main components 55 I O interfaces ...
Страница 69: ...69 ACS2000 AFE 2MVA UM 3BHS355653 ZAB E01 REV H ...
Страница 111: ...111 ACS2000 AFE 2MVA UM 3BHS355653 ZAB E01 REV H ...
Страница 118: ...Commissioning check list ...
Страница 153: ...153 ACS2000 AFE 2MVA UM 3BHS355653 ZAB E01 REV H ...
Страница 180: ......