MYLOS
®
Building Automation |
Commissioning 19
MYLOS
®
Building Automation
Commissioning
"Delayed OFF: Sec. (0...59)” parameter
Here you set the time in seconds by which the switching off is delayed after a switching off command. The time can
be entered in minutes and in seconds (see the previous parameter).
Options:
- 0
- ...
- 59 seconds