65
Operation and correct use
EN
8.2 Prepare before use
• Appoint a site operator and an installation engineer, if these are other persons than you.
• Make sure that the EVSE is installed according to the instructions in
“. Operation and installation manual”
• Make an emergency plan that instructs people what to do in case of an emergency.
• Give instructions to each end user for a charge session. Refer to section
.
• Make sure that the manufacturer service or authorized service partner commissions the EVSE. If not, contact
the manufacturer when the EVSE is ready for commissioning.
General risk:
Make sure that you have approval of the manufacturer to use the EVSE after commissioning. After
approval, do not perform any change on the EVSE.
• Make sure that the space around the EVSE cannot get blocked.
• If necessary, remove condensation before use, to prevent damage to the EVSE.
• Start/stop a charge session. Refer to section
8.3 Charge session
8.3.1 Charge an EV
• On the touchscreen, select the applicable
connector
button.
NOTE
If you skip this step, the EVSE selects the correct connector automatically when you connect the EV
charge cable to the EV.
Danger: Hazardous voltage
Check the integrity of the charging cable and connector before connecting the electric vehicle. Do
not start the charge session if damage is found.
• Remove the EV charge cable from the EVSE.
• Connect the EV charge cable to the connector on the EV.
• On the touchscreen, press the
Start
button.
• If the touchscreen shows a message to authorize the charge session, do the instruction that the touchscreen
shows.
• The EVSE charges the EV and shows the status on the touchscreen.
Danger: Hazardous voltage
The charging connector will locked in position in order not to allow removal during the charging
phase.