6.1.2 Prepare the foundation - Terra 60
6.1.2.1 Prepare the prefabricated foundation - Terra 60
A
B
D
C
C
Z1
• Take the prefabricated foundation (A).
NOTE
Contact the manufacturer to order the
foundation for your EVSE.
NOTE
Refer to
“11.3. Prefabricated foundation -
for the foundation specifications.
• Dig the pit (B) for the foundation (A).
• Place the foundation in the ground pit.
The front side is indicated by an arrow.
A
B
D
C
C
Z1
• Leave the foundation 15 mm above the ground level (D).
• Prepare the site and the conduits (C); route the power
and signal cables inside the foundation thought the
conduits applying cable slack of each cable 1000 mm.
• Pour concrete around the foundation to lock in place
the conduits and the foundation itself.
6.1.2.2 Prepare a cast foundation - Terra 60
• Make the cast foundation according to the specifications
NOTE
Refer to
for the
foundation specifications.
• Prepare the site and the conduits
• Route the power and signal cables highlighted in blue
thought the conduits applying each cable slack of 1000
mm.
• Create fixation holes for the EVSE base (in yellow).