75
Water/Glycol System
1.
Has the entire system been flushed and pressure checked?
Yes No
2.
Has the entire system been filled with fluid?
Yes No
3.
Has air been bled from the heat exchangers and piping?
Yes No
4.
Is the glycol the proper type and concentration (N/A if water)?
Yes No
5.
Is there a minimum load of 50% of the design load?
Yes No
6.
Has the water piping been insulated?
Yes No
7.
What is the freeze point of the glycol (N/A if water)?
______________________________
Electric Heating
Stages__________
Limit Lockout
Aux. Limit Lockout
Stage
Amps
Stage
Amps
1
5
2
6
3
7
4
8
Содержание H3 Series
Страница 64: ...64...
Страница 65: ...65...
Страница 77: ...Maintenance Log E Coated Coil...
Страница 79: ......