19
owners must secure all doors with locks or
nuts and bolts to prevent unauthorized access.
Figure 1 - Lockable Handle
Storage
This equipment is not suitable for outdoor use
of storage. If installation will not occur
immediately
following
delivery,
store
equipment in a dry protected area away from
construction traffic and in the proper
orientation as marked on the packaging with
all internal packaging in place. Secure all
loose-shipped items.
Wiring Diagrams
Unit specific wiring diagrams are laminated
and affixed inside the controls compartment
door.
Installation
AAON equipment has been designed for
quick and easy installation. Startup and
service must be performed by Factory
Trained Service Technician.
The H3 unit can either be shipped assembled
or shipped in sections. See the Unit
Assembly section of this document for
instructions on assembling the sections.
Locating the Unit
Placement of the unit relative to ductwork,
electrical and plumbing must be carefully
considered. Return air plenum or duct can be
mounted directly to the return air flanges.
Use flexible gasket material to seal the duct
to the unit.
Verify floor, foundation or suspension
support can support the total unit weight,
including accessory weights. Unit must be
level in both horizontal axes to support the
unit and reduce noise and vibration from the
unit.
For units with supplementary electric heat
installed with free air discharge, the supply
air discharge opening must be located a
minimum of 1.83 meters (6 feet) above the
finished floor.
Allow adequate space for piping access and
panel removal.
To ensure proper access for
field
service,
maintain
minimum
clearances for field piping and other
obstructions as indicated by Table 1 and
Table 2.
Consult local building codes for
additional service clearance requirements.