RAPID TOASTER VCT-200
15
P/N 1010710 Rev. N 02/13
McDonald’s
Rear Conveyor Cover Assy.
Spacer
Acorn Nut
Screw
Tensioner Assy.
Tape
Figure 20. Replacing Roller Tensioner Assy.
MAINTENANCE (continued)
Figure 18. Folding Release Sheet
Lay sheet on a flat
surface
Fold over so ends meet
Press lightly with finger to
form crease
Install New Release Sheet (monthly)
1. Fold a new release sheet in half, creasing the
fold only with your fingers, (Figure 18 and place
it over the platen. Allow the conveyor to draw it
into place and verify that it is positioned properly
(Figure 9, page 11).
NOTE
:
Additional Release Sheets can be obtained
through your Authorized Service Agency. Use only
your fingers to crease the fold. DO NOT use any
metal, wood, or plastic devices as they will damage
the Release Sheet.
2. Re-install the Bun Feeder and Bun Chute and
allow the toaster 30 minutes to warm up.
CAUTION
Failure to use release sheets will result in damage
to the unit and loss of warranty coverage.
Adjusting, Measuring and/or Replacing
Roller Tensioner Assemblies
NOTE: Measure the roller tensioners. They should
be 13/16” (2.1cm), or the height of a U.S. Nickel
coin from the bottom of the roller to the inner cover
(as illustrated in figure 19) and adjust or replace
them accordingly. If they have been damaged, they
should be replaced:
1. Remove screws from acorn nuts (Figure 20) and
remove old roller tensioner assy.
Check the Temperature of the Bun
Landing Shelf
IMPORTANT: If the toaster is equipped with a Bun
Buffer Landing Zone (BBLZ), you MUST remove
the BBLZ BEFORE performing the temperature
measurement in Step 1 below. This temperature
measurement is intended to be taken WITHOUT the
BBLZ attached to the toaster.
1 Take the temperature of the Bun Landing Area at
its center directly in front of the Bun Chute with a
Pyrometer/Surface Temperature (grill) Probe. The
minimum temperature acceptable is 130° F (54°
C). If it is less, contact your Authorized Service
Agency or the Technical Service Department of
A.J. Antunes & Co. at 877-392-7854 (for the U.S.
& Canada only) or 630-784-1000.
2. If a Bun Buffer Landing Zone was removed from
the toaster in Step 1, re-attach it after completing
Step 1.
Figure 19. Measuring Roller Tensioner
IN
G
O
D
W
E
T
R
U
ST
LIB
E
R
T
Y
- 2
00
0
2. Replace tensioner assy. and reassemble.
3. Make sure the spacers are placed inside the
tensioner arm. The spacers are smaller than the
holes to allow the tensioner to pivot freely.
4. Set the compression knobs back to “D” & “5” for
17 second toasters. For 10 second toasters, set
the controls to “B” & “3.” Plug in the power cord,
and turn the unit on.
NOTE: Refer to figures 2A and 2B in the Operation
section of this manual.
Содержание VCT-200 Series
Страница 25: ...RAPID TOASTER VCT 200 25 P N 1010710 Rev N 02 13 McDonald s WIRING DIAGRAMS Pictorial Wiring Diagram...
Страница 26: ...RAPID TOASTER VCT 200 26 P N 1010710 Rev N 02 13 McDonald s HI LIMIT CONTROL Ladder Wiring Diagram...
Страница 27: ...RAPID TOASTER VCT 200 27 P N 1010710 Rev N 02 13 McDonald s NOTES...
Страница 28: ...RAPID TOASTER VCT 200 28 P N 1010710 Rev N 02 13 McDonald s NOTES...