RAPID TOASTER VCT-200
11
P/N 1010710 Rev. N 02/13
McDonald’s
STEP 1
STEP 1
STEP 2
STEP 2
Daily cleaning
NOTE: Also refer to your MRC TS 019 card.
1. Turn the power ON/OFF rocker switch to OFF,
unplug the toaster and allow it to cool down.
2. Put on Heat Resistant Gloves.
3. Remove the bun feeder and bun chute (Figure
11). Wash them at the sink and allow to air dry.
4. Remove the release sheet (Figure 9) and lay it
on a clean, flat, dry surface. Spray McD© All-
Purpose Super Concentrate (HCS) on a clean,
dry towel. Wipe the towel firmly across the
release sheet lengthwise over its entire surface.
Immediately, repeat this procedure with a clean,
dry towel dampened with KAYQUAT™ Sanitizer
(HCS) solution and allow the release sheet to air
dry. Turn the release sheet over and repeat this
cleaning procedure on its’ other side.
5.
Open the Front (Heel/Club side) conveyor cover,
spray McD© All-Purpose Super Concentrate
(HCS) on a clean, dry towel and wipe the surface
of the Groovy Belt Wrap firmly from side to side
and then top to bottom. Immediately, repeat the
procedure with a clean, dry towel dampened with
KAYQUAT™ Sanitizer (HCS) solution. Close the
conveyor cover and repeat this procedure on the
second, Rear (Crown side) Groovy Belt Wrap.
NOTE: Do not remove the Groovy Belt Wrap from
toaster.
6. Plug in the power cord and turn the unit ON.
Count ten (10) seconds for 10 second toasters, or
seventeen (17) seconds for 17 second toasters.
Then, turn the toaster back Off and unplug it.
Repeat Step 5 again on both Groovy Belt wraps,
heat dampers and the surface of the inner con-
veyor covers.
NOTE: Make sure both conveyor safety interlock
switches are activated (depressed) when the cov-
ers are closed(Figure 11, page 12) or conveyors will
not rotate.
MAINTENANCE
WARNING
Turn the unit off, disconnect the power source
and allow the unit to cool down before performing
any service or maintenance on the unit.
POW
ER
TEMP
DOW
N
TEMP
UP
TEMP
SC
ALE
˚C
˚F
CAU
TIO
N
Figure 9. Removing/Installing Release Sheet
Bun Feeder
Platen
Bun Feeder Clip
Release Sheet
Bun Chute
Figure 10. Conveyor Cover Opening/Closing
7. Plug the toaster back in and turn it on, fold the
release sheet in half and place it over the toaster
platen. Allow it to be drawn into place and posi-
tioned properly.
NOTE: Check the release sheet to make sure it is
not caught in the conveyor.
8. Turn the toaster OFF and re-install the Bun
Feeder and Bun Chute.
9. Wipe the entire exterior surface to the toaster with
a clean, dry towel, dampened with KAYQUAT™
Sanitizer and allow it to air dry.
10. Verify that the Bun Thickness Compression
Controls are set to “D & 5” for 17 second toast-
ers. For 10 second toasters, set the controls to
“B & 3.”
Содержание VCT-200 Series
Страница 25: ...RAPID TOASTER VCT 200 25 P N 1010710 Rev N 02 13 McDonald s WIRING DIAGRAMS Pictorial Wiring Diagram...
Страница 26: ...RAPID TOASTER VCT 200 26 P N 1010710 Rev N 02 13 McDonald s HI LIMIT CONTROL Ladder Wiring Diagram...
Страница 27: ...RAPID TOASTER VCT 200 27 P N 1010710 Rev N 02 13 McDonald s NOTES...
Страница 28: ...RAPID TOASTER VCT 200 28 P N 1010710 Rev N 02 13 McDonald s NOTES...