Operating and Assembly Instructions – A.B.S. Flexilo MODUL for wood pellets                                   
 
Assembly 
 

Subject to technical change 

Issue 09/2016 

Page 27 of 36 

©A.B.S. Silo- und Förderanlagen GmbH 

 

 
Suction probe A.B.S. 
 
Now bolt the suction probe to the 
 ground plate by means of the  
intended hole (see picture).  
For this use one M8x10 bolt and  
one spring washer. 
Then align the draft element 
and bolt it to the module. 
For this use the M8x16 bolts,  
the washers and the stop nuts. 
 
 
 

 

 

 

 

 

 

 

 

Suction probe Fröling  
 
Now bolt the suction probe to the  
ground plate by means of the  
intended hole (see picture).  
For this use two M8x10 bolts and  
two spring washers. 
Then align the draf element  
and bolt it to the module.  
For this use the M8x16 bolts,  
the washers and the stop nuts. 
 
 
Suction probe Solarfocus  
 
Now bolt the suction probe to the  
ground plate by means of the  
intended hole (see picture).  
For this use two M8x10 bolts and  
two spring washers. 
Then align the draft element  
and bolt it to the module.  
For this use the M8x16 bolts,  
the washers and the stop nuts. 
 
 
Suction probe Windhager  
 
Now bolt the suction probe to the  
ground plate by means of the  
intended hole (see picture).  
For this use four M8x10 bolts and  
four spring washers. 
Then align the draft element  
and bolt it to the module.  
For this use the M8x16 bolts,  
the washers and the stop nuts. 
 
 

Содержание Flexilo MODUL

Страница 1: ...l is intended for skilled mechanics which have based on expert training the respective knowledge and experience As we are interested in continuously improving our technical documentation we would be pleased to get suggestions for improvement The manual has to stay with the heating system or the silo Please make sure that the manual is at any time on hand if required A B S Silo und Förderanlagen Gm...

Страница 2: ...s 9 3 1 2 Distance from ceiling 10 3 2 Condition of the room 10 3 3 Room fixtures 10 3 4 Room deaeration 11 3 5 Size Storage Volume 11 4 Scope of delivery 12 5 Assembly 17 5 1 Pre Assembly of the drawing irons 17 5 2 Assembling the frame and struts 18 5 3 Assembling the Silo bag and support bar 19 5 4 Attaching the silo cover to the ceiling 22 5 5 Fastening 23 5 6 Mounting of Filling set s 23 5 7 ...

Страница 3: ...Heating boilers for solid fuels EN14961 2 Wood pellets for non industrial use ENplus Handbook for the certification of wood pellets for heating use version 2 0 Sample fire ordinance 2005 VDI guideline 3464 green print 2012 storage of wood pellets by ultimate consumer 1 3 Pellet quality Intended use The Flexilo MODUL for wood pellets is intended solely for the storage of wood pellets The maximum ac...

Страница 4: ...ombustion chamber Poor quality pellets can impair operation of your heating system and have an adverse effect on the storage and conveying equipment Only high grade pellets can assure reliable and problem free operation of the pellet fired boiler and the conveying systems If necessary have the supplier confirm the quality of the pellets ENplus certificate ENplus certified pellets are available for...

Страница 5: ... Use of not yet released additive pellets PowerPlus pelprotec etc Please contact us for information on the current supply level In case of white rust White rust can occur during transport for example Protect frame against water water spray is already enough to form white rust However if this cannot be avoided then the white rust can quite easily be removed with RZ51 zinc cleaner The manufacturer s...

Страница 6: ... out possible sources of danger to the customer The currently valid fire protection and VDI guidelines must be satisfied prior to start up In order to avoid hazards associated with improper handling of the system have installation initial start up and service performed only by suitably qualified personnel in compliance with all applicable regulations and manufacturer s instructions Use only metal ...

Страница 7: ...the shipping documents that accompany Flexilo MODUL for wood pellets when it is delivered Nameplate with calculated storage capacity 2 5 Maintenance Regular cleaning of the bearing is required to ensure continuous trouble free and safe heating operation The fines content and the wood dust should be removed When cleaning please note the following Enter storage areas only when in compliance with saf...

Страница 8: ... used in their cell structure by the pressing process The result is that the release of the volatile components is faster especially in fresh pellets and at high ambient temperatures Emissions usually decrease after a few weeks and the odour associated evaporates completely The emissions of wood pellets consist of volatile organic compounds VOCs carbon monoxide CO and carbon dioxide CO2 Among the ...

Страница 9: ...imensions of both the silo and the room prior to installation The dimensions of the silo frame are stated on the delivery documents The dimensions of the silo frame can be determined by measuring the steel parts Length of the frame Length of the long bars Width of the frame Length of the shorter bars Height of the frame Length of the frame feet stands height of the top bar In a split design Length...

Страница 10: ...ase connectors must be secured by means of anchor bolts Rooms with moisture levels normally found in cellars do not present any problems however condensation must not occur In case of humidity the room must be ventilated properly The silo fabric is air permeable and may cause the wood pellets to absorb humidity at the silo walls Make also sure that humidity does not enter the filling pipe if it is...

Страница 11: ... aerating the Flexilo MODUL Only on customer request the Flexilo MODUL for wood pellets can be supplied with a filling line and an exhaust air line in case of rooms without exhaust air or in specific cases But from the technical aspect this is not necessary and gives no advantage Please provide for a power connection for the suction blower when installing a suction line This can also be combined w...

Страница 12: ...which is packed in a carton together with accessories and hardware required for assembly Delivery of the components Pos Illustration Description and quantity 1 1 each Silo bag of the appropriate size packed in a plastic bag 2 4 each Frame feet Split Design 6 each Frame feet 3 Supporting bar 45 45 plug in Supporting bars Supporting bar 90 45 C Profil In brackets only by Split Design 4 each Supporti...

Страница 13: ... Design 6 each Base connectors 6 Top connector Top connector for the middle Frame feet In brackets only by Split Design 4 each Top connectors Split Design 4 each Top connectors 2 each Top connectors for the middle Frame feet 7 4 x corner angel 4 x 6 x cone holding frame 16 x 24 x 16 x 24 x 32 x 48x 2 x coupler for the cone holding frame In brackets only by Split Design OPTIONAL 4 each cone holding...

Страница 14: ...x 12 x 8 x 12 x In brackets only by Split Design Screw sack with connecting material for supporting bolt 8 screws M12 with shaft 16 washers U13 8 screw nuts M12 self locking Split Design 12 screws M12 with shaft 24 washers U13 12 screw nuts M12 self locking Supporting bolt screws after support 60x60 M12 x 90 80x60 M12 x 110 80x80 M12 x 110 120x80 M12 x 150 140x80 M12 x 170 10 resp 1 2 pieces Filli...

Страница 15: ...ground strap clamp NW 3 8 4 14 2x 2x 4x Screw set for filling set pre assembled on the filling pipe 2 hex screws M10 x 140 4 washers M10 2 nuts M10 15 1 piece per filling pipe Tension rings with sealing compound 16 1 piece per filling pipe Aluminium coupling with temporary cover Storz A 17 1 piece per filling pipe Hose clamp for ø 90 to ø 100 mm 18 OPTIONAL Support Structure for fixing the silo li...

Страница 16: ... Table listing items included in the shipment 18 Optional Suction station with suction probes 18 1 x Assembly Instructions 1 x Filling Instructions 1 x Nameplate included in delivery note bag You can also find the assembly instruction as a downloadfile on our homepage www abs silos de kunden downloads You can find different assembly videos on our homepage too A B S suction probe ...

Страница 17: ...ilos the scope of delivery contains 8 shorter and 8 longer drawing irons These are assembled to 4 drawing irons for the long and 4 drawing irons for the shorter silo side Split Design 8 drawing irons with the same length for the face side 16 drawing irons with the same length for the long side Screwed connection of the divided drawing irons Do not start assembling the silo until you have become fa...

Страница 18: ...oom layout with regard to entry door and filling set Check the room height If filling is executed inside the room please note that the minimum distance from the wall to the frame has to be 80 100 cm on the side where the silo will be filled Plug the plug in elements into the frame stands and then connect the drawing irons to the outer side To connect the drawing irons with the stands and the plug ...

Страница 19: ...is a divided loop in the silo bag the lifting bar must have boreholes for the filling set 3 Align the silo bag 4 Make the necessary arrangements regarding the fastening of the silo lid according to point 5 4 5 Loop the lifting bars into the silo loops side by side Please clean the floor before spreading the silo bag There may be no sharp edged or pointy elements on the floor Attention Loop the bar...

Страница 20: ...necessary in confined spaces 6 Lay the looped supports onto the head plates and attach these immediately by passing the bolt through and fastening it Insert the C profiles and bolt them to the middle support and the head plate of the middle support Take care that the opening of the C profile points outwards ATTENTION Take care of the lifting bar with the boreholes for fastening the filling set Loo...

Страница 21: ...016 Page 21 of 36 A B S Silo und Förderanlagen GmbH Picture story about silo assembly Do control the right angle of the whole silo Silo and drawing irons assembled correctly Then loop the silo onto the C profile and slide the second support bar over the C profile In confined spaces slide the cone mounting frame in first ...

Страница 22: ...s for the baffle that is sewn into the cover fabric opposite the filler neck Take care of the position of the supporting loops prior to attach the ceiling holders to the spread silo The loops must be attached one at a time during the following steps HINT Ideally use our supporting structure for cover loops and slide a galvanized pipe or a copper pipe through the loops on the cover fabric As an alt...

Страница 23: ...arth the filling set as described in chapter Earthing I II III 2 Use the bolts provided to attach the filling line to the top bar 3 Slide the filler neck over the filling line and beaded edge of the filling pipe as far as possible and secure with the aid of the hose clamp provided 4 Only use Hoval metallic filling pipes with smooth edges on the inside 5 Always finish with the provided 500 mm moder...

Страница 24: ...e holding frame must be screwed together by using the steel angles provided for It is absolutely necessary to guide the screws from the inside to the outside holding frame with corner angle Split Design All six bars of the cone holding frame are to be bolted together after they have been inserted into the intended loops on the silo sack The two cone support bars on the long side the side with the ...

Страница 25: ... to the outside Cone holding frame Split Design In confined spaces this step can be carried out parallel with 5 3 i e when inserting the cone support bar into the loop for the cone support bar Afterwards slide the support into the intended loop and bolt the support to the frame foot so that the cone support bar is already hanging in the loop for the cone support bar Silo with cone holding frame Co...

Страница 26: ...u need Module Suction probe Ground plate Draft element 4 x M8x16 bolts 8 x washers 4 x M8 stop nuts for bolting the draft element 4 x M8x10 bolts 4 x spring washers for bolting the ground plate Depending on the suction probe 1 4 x M8x10 bolts M8 spring washer in case of Hapero 2 x M8x16 bolts 2 x spring washers in case of Hargassner 2 x M6x10 M6 spring washers Bolt the ground plate to the module T...

Страница 27: ...ole see picture For this use two M8x10 bolts and two spring washers Then align the draf element and bolt it to the module For this use the M8x16 bolts the washers and the stop nuts Suction probe Solarfocus Now bolt the suction probe to the ground plate by means of the intended hole see picture For this use two M8x10 bolts and two spring washers Then align the draft element and bolt it to the modul...

Страница 28: ... For this use the M8x16 bolts the washers and the stop nuts Suction probe Hapero Now bolt the suction probe to the ground plate by means of the intended hole see picture For this use two M8x16 bolts and two spring washers Please note Take the 45 mm hose and put it over the upper connection of the suction probe and fasten it using the hose clamp Then align the draft element and bolt it to the modul...

Страница 29: ...outwards Then pull the silo sack over them and guide the holes of the silo sack over the bolts Now from the outside place the clamping bars with holes over the bolts Be sure to use the angle clamping bars at the corners HINT Start at the corners First the clamping bar with the bolts on the one side then align the angle clamping bar and then push the second clamping bar with bolts against it on the...

Страница 30: ...k that the nameplate is attached in a clearly visible location on a frame leg or the filling line Check the room layout wall and ceiling clearance condition of the room fixtures in the room room ventilation Have the frame earthed by a licensed electrician The earth resistance must not exceed 106 Ω Check that the silo frame is anchored to the floor properly Check that the silo cover is suspended co...

Страница 31: ... fixtures and swivelling jib 3 Climbing equipment The contractor must ensure that 1 Storage facilities whose upper edges are more than 1 m above the floor and must be mounted for regular operational work must be equipped with secure climbing equipment Instruction guidelines re item 1 The requirement is regarded as fulfilled for silos when e g stairs with railings are attached on the free sides or ...

Страница 32: ... to the filling couplings 8 1 General instructions Look after the accessibility of the filling nozzle s Make sure that that you have an adequate access road to your storage system 3 m width and 4 m headroom are needed at least The A B S silo for wood pellets has to be filled in the way that the pellets build up from behind The filling pressure has to be set up that the flight path of the pellets d...

Страница 33: ... centered on the narrow side of the silo 8 3 Filling with two filling nozzles From a frame width of 2 5 m silos are equipped with a second filling nozzle In this case a better filling level will be reached Flexilo MODUL for wood pellets with 2 filling sets While filling with line 1 you can optionally exhaust with the second nozzle In this case you have to make sure that the fabric won t get sucked...

Страница 34: ...x with 230V and 16A protection must be accessible outside the storage room This power connection can be used for a possible suction blower Note before filling Switch off the heating system prior to starting the filling process Check prior to filling that the filling line and items attached to it are assembled and are not direct air upward towards the ceiling or downward into the silo When filling ...

Страница 35: ...d the hose length The filling pressure should be between 0 3 bars for a hose length of about 10 m and 0 6 bars for a hose length of about 30 m The required filling pressure and air flow rate can vary depending on the installation conditions They must be adjusted so that the Flexilo MODUL will be filled starting from the back of the silo When filling first inflate the Flexilo MODUL for wood pellets...

Страница 36: ...must be bolt together with the lifting bar o The filling pipes must be bolt together among each other by clamping rings so that no rotation occurs o The filling coupling must be easily accessible without using ladders etc and reachable o The fabric neck on the filter lid must be pulled as far as possible over the filling pipe and beading rim and it must be fixed with a hose clamp o All parts of th...