9
78-8122-3167-4
8.4
Mount the splice head alongside the frame so that the modules/connectors can be stored in one of the two
methods shown below.
8.5
Splice the frame stubs and cable groups together following your company's procedures.
Note: If you are using non-sealed 3M
™
MS
2™
Modules, install 3M
™
4075 or 4077
Series Sealant Boxes.
Note: Carefully follow safety, health and environmental information on sealant
box label or Material Safety Data Sheet.
8.6
After the splicing is complete, bundle and store connections.
8.7
Repeat this procedure with the middle frame.
8.8
Use a splicer’s box or equivalent to support the right-hand frame to keep it off the ground and to prevent
damage.
8.9
Untie the frame stubs from the back of the frame and lay it on the metal side. Bring the stubs to the cabinet.
8.10
Mount the splice head in the cabinet so that the modules/connectors can be bundled and stored in the same
method as shown above.
8.11
Splice the frame stubs and cable groups together following your company's procedures.
8.12
After the splicing is complete, install this frame by resting this frame on the pivots and attach the safety cable
to the frame.
8.13
Bundle and store the connections as shown above.