Installation Manual 2N® IP Style
39
/
88
Use a levelling key to check the proper height of detent embedding to make sure that the key is
aligned with the mounting box edge and also touches the detent surface (6).
Put the brackets to the left and right sides of the bottom detent handle (7A) and fit their
positions using screws (7B).
Now the mounting box installation is complete (8).
2.3 Electric Installation
2N
®
IP
Style
can
be fed either from an external 12V / 4 A DC power supply or from a PoE+ 802.3at
supporting
LAN.
External Power Supply
For reliability reasons, use a 12 V ±15% SELV supply dimensioned to the current consumption as
required for feeding of the main unit and connected extending modules.
DC voltage
[V]
Load
[A]
Max power
[W]
12
3
36
12
4
48
PoE+ Supply
2N
®
IP
Style
is
compatible with the PoE+ 802.3at technology and can be supplied directly from
the LAN via compatible network elements. If your LAN does not support this technology, insert a
PoE
injector,
Part No. 91378101
,
between
2N
®
IP
Style
and
the nearest network element. This
power supply
provides
2N
®
IP
Style
with
21.6 W for feeding of the main unit and connected
modules.
Содержание 02407-001
Страница 1: ...Installation Manual 2N IP Style v 1 1 www 2n com ...
Страница 32: ...Installation Manual 2N IP Style 32 88 2N IP Style Main Unit Installation ...
Страница 37: ...Installation Manual 2N IP Style 37 88 2 2 2 Mounting Box Installation Mounting Box Installation ...
Страница 79: ...Installation Manual 2N IP Style 79 88 3 5 Downloads Software 2N USB driver 2N IP Eye 2N Network Scanner ...
Страница 88: ...Installation manual 2N IP Style 88 88 ...