2N TELEKOMUNIKACE a.s., www.2n.cz
20/131
Cut a circular hole in the wall of the diameter of 103 mm and depth of 50 mm before
installation. It is assumed that all necessary cables of the maximum length of 25 cm
will lead to the hole. Put the flush mounting box in the hole to make sure that the hole
is deep enough. If the hole complies with the box size, wall in the box and level the
box using a water level on the holding clips.
When the mortar hardens, break off the
Use anchoring elements to fix the
clips and cap the box with the cover provided.
device into plasterboard.
Downloads
Use a 2.5 mm hexagon key wrench (included in the
delivery) for
2N Indoor Compact
®
fitting
into the flush mounting box.
2N Indoor Compact
®
Note
While flush mounting
respect the local standards
2N Indoor Compact
®
concerning installation of electronic devices on flammable materials.
Содержание 2N Indoor Compact
Страница 1: ...www 2n cz 2N Indoor Compact User guide Version 2 26 ...
Страница 19: ...2N TELEKOMUNIKACE a s www 2n cz 19 131 ...
Страница 22: ...2N TELEKOMUNIKACE a s www 2n cz 22 131 2 2 Brief Installation Guide ...
Страница 28: ...2N TELEKOMUNIKACE a s www 2n cz 28 131 2N IP Network Scanner IP Address Change ...
Страница 32: ...2N TELEKOMUNIKACE a s www 2n cz 32 131 3 Configuration 3 1 Factory Reset 3 2 Software Configuration ...
Страница 36: ...2N TELEKOMUNIKACE a s www 2n cz 36 131 Caution All the user data will be deleted upon the factory reset ...
Страница 41: ...2N TELEKOMUNIKACE a s www 2n cz 41 131 ...
Страница 86: ...2N TELEKOMUNIKACE a s www 2n cz 86 131 Icon Description Move up Move down ...
Страница 126: ...2N TELEKOMUNIKACE a s www 2n cz 126 131 7 1 Troubleshooting For the most frequently asked questions refer to faq 2n cz ...