ZXR10 ZSR Hardware Installation Manual
Figure 2-8 Hardware Installation Flow Diagram
Prepare Installation
Before hardware installation, prepare the following items:
l
Know device locations in the lab and lab environment
l
Know device configurations and composition
l
Prepare engineering design documents and installation instruction documents needed
for hardware installation
l
Prepare the necessary installation tools and transport tools
l
Prepare the necessary certificates and procedures needed for accessing sites
For details, refer to Chapter 3.
Install Main Devices
The installation flow of main devices is shown in
Figure 2-8
.
2-6
SJ-20110803091932-002|2011-08-30 (R2.0)
ZTE Proprietary and Confidential