
ZXMBW E9200 Indoor Pico Base Station User Manual
36
Confidential and Proprietary Information of ZTE CORPORATION
F
I G U R E
2 5
Z X M B W
E 9 2 0 0
C
A B I N E T
I
N S T A L L A T I O N
P
A R T S
1
2
1. Expansion bolt 2.Installation plate
2. Mount the cabinet on the installation plate, and insert the 4
hex flange bolts at the back of the cabinet through the larger
parts of the cucurbit holes on the plate.
3. Move the inserted 4 hex flange bolts into the smaller parts of
the cucurbit holes to fix the cabinet to the plate.
4. Tighten the 4 hex flange bolts
E
ND OF
S
TEPS
.
Pole-mount Installation
The following describes the pole-mount installation procedure of
ZXMBW E9200 cabinet.
The following accessories are required for pole-mount
installation.
One installation plate
4 expansion bolts and 4 hex flange bolts
Hoops
Fastening tools
Perform the following steps to install the cabinet as pole-mount
mode.
1. Mount the Installation plate on the pole with using the hoops
and fix it with four expansion bolts.
Installation
Accessories
Steps
Summary of Contents for ZXMBW E9200
Page 4: ...This page is intentionally blank ...
Page 8: ...This page is intentionally blank ...
Page 14: ......