Begin
End
Cabinet
Installation
Hardware installation
check
-
Power-up and
Power-down Test
-
Cables
Installation
Installation
preparation
Main antenna system
Installation
GPS antenna system
Installattion
Installation Precautions
The installation engineer should check the working environment
before starting the installation. The installation engineer must be
familiar with the installation position, networking, data
configuration and cables of ZXMBW E9200.
Besides, pay attention to the following:
Operations on the ZXMBW E9200 are forbidden if the cabinet
is powered on.
Installing the outdoor antenna feeder system is forbidden
during rainy and lightning situations.