Unpacking Inspection
The project supervisor and the representative of customer must
be present on site during unpacking.
The following describes the procedure for unpacking inspection
ZXMBW E9200 boxes.
Perform the following steps to unpack ZXMBW E9200.
1. Count the number of packing boxes. Check whether the
packing boxes are intact and whether the actual arrival place
is the correct place. If yes, unpack the goods for inspection.
2. Check whether the goods are consistent with the goods in
the Equipment Acceptance List and archive the report.
3. If any shortage of goods, wrong goods, superfluous goods or
goods damage found,
note it and inform ZTE office.
4. The project supervisor should fill Unpacking for Inspection
Feedback Table and send it back to ZTE office.
Caution
When the equipment is moved from a colder and drier place
to a hotter and damper place, wait for 30 minutes before
unpacking the equipment. Otherwise, moisture may
condense on the surface of the equipment and cause damage.
Properly recycle the desiccant lest.
E
ND OF
S
TEPS
.
Acceptance and Handover
Check the goods one by one according to the name, type and
amount on the shipping list.
There should be no dents, bulges, scratches, peels, blithers,
blisters or smudges on the outer surface of the cabinets.
The surface paint on the cabinets should not fall off or be
scratched.
The fastening screws should not be loosened, disconnected,
or mistakenly placed.
The accessories and fittings needed for cabinet installation
should be complete.
Arrange the checked goods by type.
Prerequisite
Steps
Acceptance