ZXC10 BTSB (V1.0) cdma2000 Base Transceiver Station Installation Manual
13-14
Bolt
Clamp
Installation part 1
Adjustable
antenna arm
Installation part 2
Cable strap
Antenna pole
Antenna
Antenna RF socket
RF cable socket (with
waterproof treatment)
Bolt
Clamp
Fig. 13.15-1 Antenna Installation Checking the Feeder SWR
13.16 Checking Feeders of SWR
Requirements:
1. Measure the SWR after antennas and all feeders are installed.
2. The terminal of the indoor 1/2" jumper to the rack is connected with an SWR
tester for testing. The SWR should be less than 1.5, preferably 1.3.
Summary of Contents for ZXC10 BTSB I1
Page 4: ......
Page 16: ......
Page 22: ... ii Table C 2 1 BTSB Board Indicators C 2 ...
Page 76: ......
Page 91: ...Chapter 7 Cable Installation in Cabinet 7 15 Fig 7 3 5 RF Cable Interface in RFS ...
Page 96: ......
Page 106: ......
Page 114: ......
Page 157: ...Chapter 12 Board Installation 12 11 Fig 12 5 1 Positions of Boards ...
Page 158: ......
Page 174: ......
Page 180: ......