09 - 10 RT35 Rough Terrain Crane
SPECIFICATIONS – UPPERSTRUCTURE
A. Main boom and extend / retract mechanism
(1) The main boom has 4 hexagonal boom sections (1 basic boom and 3 telescopic
sections) made of high-tensile steel.
(2) The main boom head has 4 “sheaves”. You do not have to remove “wedges”
when you change line parts. A rooster sheave is mounted at the boom head.
(3) The boom sections extend / retract by a hydraulic cylinder and two sets of boom
extension / retraction ropes. The cylinder has a balance valve.
Min. main boom length (with sections fully retracted):
9800 mm / 32.15 ft
Max. main boom length (with sections fully extended):
31000 mm / 101.7 ft
Min.
extend
time:
70
s
B. Jib
(1) It consists of two jib sections. Jib section I is lattice structure (9 m long) and jib
section II is box-shaped structure (15 m long). The jib section II is secured into jib
section I, and the whole jib is secured onto the right side of main boom via
moveable pins during traveling.
(2) A sheave is assembled at the jib head.
Offset:
0°, 20° and 40°
Jib length:
9 m, 15 m / 29.5 ft, 49.2 ft
C. Derricking
mechanism
(1) Rear-mounted single derricking cylinder with two-way balance valve
Derrick angle:
-3° - 78°
Derrick speed (-3° - 78°): 56 sec.
D. Winch
mechanism
(1) Main and auxiliary winches
(a) Main and auxiliary winches have the same parts, which include:
Variable Displacement Hydraulic Motor with Axial Plunger
Planetary Reducer
(b) The hydraulic motor drives the winch with a planetary reducer. When the
winch turns (rotates), the wire-rope “reels off” or “spools on” to the winch.
(2) Wire-rope
a) Torsion resistant hoist rope
Max. hoist rope strength:
70 kN
Summary of Contents for RT35
Page 1: ...RT35 ROUGH TERRAIN CRANE OPERATOR S MANUAL Edition 1 Dec 2013...
Page 2: ......
Page 7: ......
Page 8: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 18: ...03 2 RT35 Rough Terrain Crane MAINTENANCE LOG Item Adjusting Condition Date...
Page 21: ......
Page 22: ......
Page 32: ...04 10 RT35 Rough Terrain Crane 3 Figure 04 4 Hand Signals for Crane Operation...
Page 37: ......
Page 38: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 82: ...06 28 RT35 Rough Terrain Crane Figure 06 23 Engine Warning Figure 06 24 Transmission Warning...
Page 88: ...06 34 RT35 Rough Terrain Crane Figure 06 34 Transmission History Warning Figure 06 35 About...
Page 91: ......
Page 92: ......
Page 130: ...07 38 RT35 Rough Terrain Crane Figure 07 36 Pin 1 Removal...
Page 136: ...07 44 RT35 Rough Terrain Crane Figure 07 48 Signal Personnel...
Page 147: ......
Page 148: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 162: ...09 8 RT35 Rough Terrain Crane Figure 09 1 Overall View RT35 Rough Terrain Crane...