background image

Summary of Contents for AIR PRO 500

Page 1: ...P A P A P 800 P 800 P 500 P 500 P 1200 P 1200 P 800 1200 800 P 800 P 1200 P 800 P AIR PRO 500 800 1200 USER MANUAL ZONAIR3D...

Page 2: ......

Page 3: ...erns over the constant and ever increasing deterioration of the quality of the air we breathe Air Pro is an air purification equipment specially designed for indoor spaces Its unique system filters an...

Page 4: ......

Page 5: ...200 5 6 2 CONNECTION PANEL DIAGRAM 5 6 2 1 ELECTRICAL WIRING CONNECTION AND CONTROL DETAIL 5 6 2 2 FILTER STATUS NOTICE 5 7 MECHANICAL CONNECTION OF THE UNIT S AIR PRESSURE INTAKES______ 5 7 1 ELEMENT...

Page 6: ......

Page 7: ...e for any damage or injury caused to persons or objects resulting from failure to comply with safety standards and any possible modifications to the product The EC seal and statement of conformity ser...

Page 8: ...g If there is any damage to the unit or the shipment is not complete write down the problems on the delivery slip and send a claim to the carrier Also report any problems to Zonair3D ICON LABEL MEANIN...

Page 9: ...support its weight This must not be installed under any circumstances in flammable or explosive environments such as environments loaded with oil vapors saline air or corrosive The installation of the...

Page 10: ...filter The following figure identifies the main components of the main module 5 2 1 INTERIOR COMPONENTS ABSOLUTE FILTER SECTION FAN SECTION PREFILTER GRSYSTEM SECTION Flujo de aire Flujo de aire Flujo...

Page 11: ...4 1 SOCKET H14 4 INPUT H14 PRESSURE SWITCH 2 INPUT H14 PRESSURE SWITCH Maintenance Maintenance Air Flow Maintenance Maintenance 1 2 3 4 5 2 1 3 11 8 7 5 6 12 10 9 4 5 2 2 EXTERIOR ELEMENTS 5 2 2 1 WIT...

Page 12: ...ling the equipment must allow space which is free of obstruction to be able to freely access the device for maintenance The space required will depend on the side of the device where the extraction is...

Page 13: ...5 5 1 2 BENCH FLOOR MOUNTED For floor mounting you must Assemble the 4 brackets together with their screws in the 4 corners of the bench support equipment These brackets will NOT be used to join them...

Page 14: ...is disconnected and that there is no voltage between the cables Once installed the device must comply with the following Directives Low Voltage Directive 2014 35 EU Safety in machines 2006 42 EC Elec...

Page 15: ...15 AIR PRO 500 800 1200 5 6 1 ELECTRICAL PRINCIPLE AND CONTROL DIAGRAM 5 6 1 1 AIR PRO 500...

Page 16: ...5 6 1 2 AIR PRO 800...

Page 17: ...17 AIR PRO 500 800 1200 5 6 1 3 AIR PRO 1200...

Page 18: ...System filter GRSV gas filter you have to access the inside of the Electronic Control Board PCB see situation in point 5 2 2 1 by unscrewing the front plastic cover and carry out the following action...

Page 19: ...ystem 1 H14 PRESSURE SWITCH 2 PCB Printed circuit board 3 ROTARY SWITCH 4 DIFFERENTIAL PRESSURE SENSOR5 5 G4 PRESSURE SWITCH 7 PRESSURE SOCKET G4 5 PRESSURE TAKE OFF G4 6 INPUT G4 PRESSURE SWITCH 8 IN...

Page 20: ...5 7 2 CONNECTION DIAGRAM OF ELEMENTS AND PRESSURE PORTS 5 7 2 1 PRESSURE SWITCHES DIFFERENTIAL PRESSURE PROBE PCB PAC500V PAC800V PAC1200V...

Page 21: ...ONNECTION TO THE Z3D INDOOR AIR QUALITY PROBE Only the probe provided by the Z3D manufacturer can be connected This probe has several functionalities ON OFF of the equipment depending on the quality o...

Page 22: ...5 8 1 DIAGRAM OF THE PRINCIPLE OF CONNECTION TO THE Z3D AIR QUALITY PROBE PAC500V PAC800V PAC1200V...

Page 23: ...aring structure for the ducts The connection of the equipment to the air ducts must be made by means of flexible connections to avoid the transmission of vibrations to the installation It will be chec...

Page 24: ...age indicated on the characteristics plate The fan will not start if the network of ducts is not completely closed since connecting the fan without load can cause over currents that could damage the m...

Page 25: ...ds except when justified otherwise for technical reasons According to the equipment s operating needs it is crucial to make a list of those elements that are needed to quick resolve equipment faults A...

Page 26: ...efficiency 8 3 2 REPLACING THE FILTERS To replace the filters it is recommended to use PPE individual protection equipment FFP2 mask gloves and goggles To extract the filter open the corresponding ins...

Page 27: ...Czech Republic Denmark Estonia Finland France Germany Greece Hungary Italy Latvia Liechtenstein Lithuania Luxembourg Malta Netherlands Norway Poland Portugal Republic of Ireland Romania Slovakia Slove...

Page 28: ...cepted as proof The consumer must contact the company within the period indicated above through the following contact details ZONAIR3D C CERDANYA 7 08140 CALDES DE MONTBUI BARCELONA SPAIN Tel 34 93 55...

Page 29: ...nt services parts articles applications installations repairs external wiring or connectors not supplied or authorised by Zonair3DTM e Damage caused by connections to improper power line current volta...

Page 30: ...P A P A P 800 P 800 P 500 P 500 P 1200 P 1200 P 800 1200 800 P 800 P 1200 P 800 P AIR PRO 500 800 1200 ZONAIR3D...

Reviews: