4. Check the needle bar height.
Turn the machine pulley to move the needle
bar the its lowest position and adjust so that
reference line is aligned as shown in the machine
head.
5. Tilt back the machine head.
6. Adjust the clearance between the needle
and
the rotary hook tip
.
1) Loosen screws
.
2) Move the rotary hook base
to the left or
right so that the cleaance between the needle
and the rotary hook tip
is 1-3mm.
3) Tighten screw C ,and then trun the adjusting
screw
to asjust so that the clearance between
the needle
and the rotary hook tip
is 0.05mm.
After adjusting,securely tighten screws
and
.
4. Check the needle bar height.
Turn the machine pulley to move the needle
bar the its lowest position and adjust so that
reference line is aligned as shown in the machine
head.
5. Tilt back the machine head.
6. Adjust the clearance between the needle
and
the rotary hook tip
.
1) Loosen screws
.
2) Move the rotary hook base
to the left or
right so that the cleaance between the needle
and the rotary hook tip
is 1-3mm.
3) Tighten screw C ,and then trun the adjusting
screw
to asjust so that the clearance between
the needle
and the rotary hook tip
is 0.05mm.
After adjusting,securely tighten screws
and
.
Summary of Contents for ZJ2842-BD
Page 1: ......
Page 2: ......
Page 4: ......
Page 6: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 15: ...2 ...
Page 16: ...3 ...
Page 17: ...4 ...
Page 21: ...8 Kg Kg ...
Page 23: ...10 ...
Page 28: ...15 ...
Page 52: ...39 ...
Page 73: ...60 22 24 14 22 24 14 1 1 2 2 3 3 8 13 13 16 11 23 22 13 13 16 11 23 22 ...