Outdoor Prepackaged System Installation Instructions

  1.  Review the drawing in Fig. 3 on page 8 and the actual sys tem 

to be come fa mil iar with the components in the pack aged 

grind er pump sys tem.  Re view where the unit will be in stalled.  

Determine where the power feed, inlet pipe, and discharge 

pipe will be located.

  2.  Remove the unit from packing.  Prepackaged outdoor sys tems 

are preassembled at the Zoeller Company and re quire a 

min i mum  of 

fi

 eld assembly work.  Float switches are set and 

teth ered for proper operation from the Fac to ry.  Sys tems using 

an automatic unit, WD or WH series, have an integral “on/off” 

fl

 oat switch.  See Fig. 4 on page 5 for ad just ment instructions.  

The alarm switch should be lo cat ed 3” above the pump “on” 

level.  Three 

fl

 oat sys tems used with a control panel are placed 

at 27”, 24”, and 15” from the bot tom of the ba sin.  Four 

fl

 oat 

sys tems used with a control panel are placed at 30”, 27”, 24”, 

and 15” from the bottom of the basin. If the invert location is at 

or below the level of the 

fl

 oat switches, contact the factory.  

  3.  Float switches are tied in place for shipping purposes on all 

model prepackaged systems.  Cut the cable tie around each 

fl

 oat switch bulb or the unit will not operate properly.  Ver i fy that 

where the 

fl

 oat switches are set will work for your ap pli ca tion.  

Verifying that the 

fl

 oat switches are set prop er ly and will 

not hang up inside the basin is the re spon si bil i ty of the 

installing contractor. 

  4. Dig a hole for the basin.  The hole should be at least 24” 

larger in diameter than the basin diameter to provide 12” of 

back

fi

 ll all around and deep enough to provide either 12” of 

com pact ed  back

fi

 ll or 6” when a concrete pad is required.  

Note:  Care must be taken when excavating in order to 

avoid underground utilities and disturbance of ex ist ing 

struc ture foun da tions.  The hole should be located at least 

ten feet from adjacent structures.  Ad di tion al dis tance may 

be required to suf

fi

 ciently locate the basin outside of the 

load ing area of the adjacent structures.

  5.  The location of the inlet hub is determined by the depth of the 

inlet pipe.  The inlet hub must be used with 4” pipe.  It is best 

to in stall the inlet on the side of the basin op po site the 

fl

 oat 

switch es.  To install, use a 4” hole saw to drill into the side of the 

basin at the cor rect el e va tion.  Center the hub inner di am e ter 

with the hole in the basin.  Attach the hub to the side of the 

basin using the sealant and hard ware pro vid ed.

  6.  The bottom of the ex ca va tion can now be properly back

fi

 lled, 

com pact ed and leveled.  Set basin in hole.  En sure the 

removable cover extends above the 

fi

 nished grade line and 

the grade slopes away from the unit.  Back

fi

 ll and subbase 

should be 1/8” –3/4” pea gravel or 1/8” –1/2” crushed stone.  

(Ref er ence basin installation in struc tions included with unit.)  

Connect the 4” inlet pipe to the inlet hub.  

  7. Pouring a concrete anchor around system can now be 

com plet ed.  Basin should be 

fi

 lled with water when pouring 

concrete to min i mize movement of the system.  Back

fi

 ll 

around basin with spec i 

fi

 ed media.  Care should be used 

to avoid damaging com po nents or leaving voids when back 

fi

 lling.  Refer to Basin installation ref er ence guide on more 

speci

fi

 c requirements.

  8. PVC or HDPE discharge piping is connected to the 1¼” 

threaded fitting located in the basin sidewall.  Support 

discharge piping with suf

fi

 cient back

fi

 ll.

  9.  On basin depths of 72” and greater, the system’s disconnect 

assembly is shipped loose and must be screwed into the 

discharge piping.  Apply pipe dope to threaded connection.

 10.  Connect pull rod to Pump assembly.  Connect lift cable to top 

of pump.  Lower the pump into basin ensuring the dis charge 

pipe brack et slides into the dis con nect 

fi

 tting.

 11.

  Note:  The grinder basin is a sewage holding tank.  Vent 

connection should be installed in accordance with all 

national, state and local plumbing codes.

 12.  Dig a trench for the electrical conduit.  The conduit should be 

lo cat ed below the frost line.  Follow all applicable electrical 

codes.

 13.  Con nect elec tri cal conduit and wiring to junction box 

ac cord ing to wiring in struc tions included in this man u al and 

wiring diagram in box.  Use the potting kit provided with the 

junction box.  Follow the instructions for sealing the conduit 

connection at the junction box.

 14.  Mount the control panel within sight of the system.  Connect 

fl

 oat switches and pump cords according to the “Pump Wir ing 

In struc tions” found later in this manual and located inside the 

panel enclosure.

 15.  Remove any debris from the basin.  Using clean water, check 

the system for proper operation.

 16.  Seal and secure the lid using the proper bolts and seal ant 

when using a lid without a formed gasket. 

 17.  Test system for leaks and proper pump operation.

 18.  Record system start up data for future reference.

 

 

 This set of instructions is for factory prepackaged outdoor grinder systems only.  If this is a 

fi

 eld as sem bled 

outdoor sys tem you can use these in struc tions as a guideline.  If this is an indoor system then go back to pages 6-7 in this manual 
that cov ers indoor systems.

Summary of Contents for 820

Page 1: ...n Table of Contents Safety Instructions 1 Limited Warranty 2 Preinstallation Checklist 3 General Information 4 Pump Wiring Instructions 5 Typical Indoor Prepackaged System 6 Indoor Prepackaged Installation Instructions 7 Typical Outdoor Prepackaged System 8 Outdoor Prepackaged Installation Instructions 9 Operation 10 Cutter Maintenance 11 Service Checklist 12 Safety Instructions TO AVOID SERIOUS O...

Page 2: ...equential damages so the above limitation or exclusion may not apply to you This warranty gives you specific legal rights and you may also have other rights which vary from state to state Manufacturer warrants to the purchaser and subsequent owner during the warranty period every new product to be free from defects in material and workmanship under normal use and service when properly used and mai...

Page 3: ...1 Make sure the power source is capable of handling the electrical requirements of the grinder pump as indicated on the nameplate 2 A disconnect switch should be installed ahead of the pump 3 If Grinder pumps are operated by control panels with vari able level float control switches it is the responsibility of the installing party that float control switches will not hang up on the grinder pump or...

Page 4: ... system installation 3 All electrical connections including pump to control box and power supply to control panels must comply with the National Electrical Code and applicable local codes Conduit and panel enclosure openings must have a gas and watertight seal Installation of electrical panels conduit and connections should be made by a qualified licensed electrician A UL Listed potting kit P N 10...

Page 5: ...duit directly to pump Pump Wiring Instructions Installation and checking of electrical circuits and hardware should be performed by a qualified licensed electrician 010415 AUTOMATIC WIRING DIAGRAM MODELS WD820 and WH820 010443 NONAUTOMATIC WIRING DIAGRAM MODELS E820 and I820 FIGURE 4 FIGURE 5 Models WD WH are fully automatic A float switch is included and factory wired in the pump circuit to provi...

Page 6: ...0 X 1 4 STEEL CORD SEAL INSPECTION PLATE 3 GROMMET SEAL SWITCH CORD ALARM FLOAT BASIN COVER LIFTING BOLT 16 X 1 4 STEEL 5 16 304 STAINLESS STEEL PUMP PLATE PUMP POWER CORD ON FIELD INSTALLED ALARM 4 FIBERGLASS HUB CAST IRON ADAPTERS OFF 24 NOMINAL TO ALARM PANEL BALL VALVE FIELD INSTALLED GALVANIZED PIPE 1 1 4 X 32 GALVANIZED PIPE 1 1 4 X 12 GRINDER PUMP SINGLE PHASE 2HP 1 1 4 GROMMET SEAL FIELD I...

Page 7: ...very low traffic area within 15 of the power disconnect The hole should be at least 8 larger in diameter than the basin in order to leave 4 of backfill all the way around the perimeter A minimum of 4 of compacted subbase is also required Backfill and subbase should be 1 8 to 3 4 pea gravel or 1 8 to 1 2 crushed stone Also reference the basin installation instructions included with the unit 6 The 4...

Page 8: ...EL PULL ROD 3 8 X 1 416 STAINLESS ALARM FLOAT HIGH LEVEL DISCHARGE FITTING 1 1 4 BULK HEAD FIELD INSTALLED 4 RUBBER INLET PIPE SEAL 28 MIN OR PER STATE AND LOCAL CODES COUPLING TO CONTROL PANEL HIGH WATER ALARM FIELD INSTALLED 60 OTHER BASIN SIZES ARE READILY AVAILABLE Typical Outdoor Grinder Pumping System Installation All installations must comply with all applicable electrical and plumbing code...

Page 9: ...lant and hardware provided 6 The bottom of the excavation can now be properly backfilled compacted and leveled Set basin in hole Ensure the removable cover extends above the finished grade line and the grade slopes away from the unit Backfill and subbase should be 1 8 3 4 pea gravel or 1 8 1 2 crushed stone Reference basin installation instructions included with unit Connect the 4 inlet pipe to th...

Page 10: ...nd securely installed Floats positioned properly Discharge valves open 3 16 vent hole drilled in pipe between check valve and pump Once the above has been verified proceed with the following checks Pump power cables and control floats properly installed and voltage verified Conduit connections to panel and junction box are properly sealed After installing the pump into the containment area with ad...

Page 11: ...vethespacer shims located behind the star cutter 5 Remove the three cap screws holding the disc and remove disc from the pump 6 The disc and star cutter can be replaced with new service partsorresurfacedbygrinding Resurfacingisaccomplished by surface grinding both disc and star cutter to a 32 micro finish Do not attempt grinding in the field Send parts to a qualified machine shop or return to the ...

Page 12: ...t system for proper operations Repair and service should be performed by a Zoeller Pump Company Authorized Service Station only SAFETY PROCEDURES For your protection always disconnect pump and panel from its power source before handling Never enter the basin until it has been properly vented and tested Any person entering a basin should be wear ing a harness with safety rope extending to the surfa...

Reviews: