5
INSTALLATION GUIDE
POSITIONING THE POWER PACK
1. Locate a suitable space for the power pack bracket. It should be installed no
further than 1.8 metres away from the cell - ideally in a filtration shed or close to
the filtration equipment.
PLEASE NOTE:
If fixing to a post it must have a waterproof panel fitted (behind
the unit), at least 450mm wide and 470 mm high.
2. The power pack must be installed a minimum of 3.5m from the inside wall of
the pool and/or hot tub. Any additional local installation codes must also be
adhered to.
3. Ensure the power pack is protected from pressurized water spray such as that
from irrigation sprinklers, mechanical impacts and/or damage, and inaccessible
to children.
4. Using screws provided, fasten the bracket securely to the wall and position the
power pack on the bracket. Plug into power point, but don’t turn on the power.
POSITIONING THE CHLORINE GENERATING CELL
PLEASE NOTE:
The cell should always be the last device placed on the water
pipe (In the return line to the pool).
5. Ensure the cell is placed horizontally, with the Inlet pipe connecting to the fitting
closest to the cell lead.
6. Using screw barrel fittings (supplied), attach the cell to the pipe. If using 40mm
pipe, you will need to fit the cell using the reducing bushes (also supplied).
7. When connecting the lead from the power pack to the cell match up the