P-13
P-14
Installation instructions
Step-by-step installation instructions
(top entry wiring)
Step
3
Cut out on the back of the EV charger.
Use the 4pcs M6*8 screws to fix the
EV charger to the mounting plate as
picture shows (Screws torque 1.5NM-
2.0NM).
Find the hole for cut out on the back
of EV charger.
Step
4
Wiring
Note: lt is the installer's responsibility to
identify whether additional grounding is
required to ensure that local regulations
are met.Grounding must be installed at
the power source and not at the cable
entry to the EV Charger.
Note: Consult with your local electrician
or refer to your local code forproper
wire sizing appropriate for the currents
in your EV Charger.
As the picture at left shows, use the
screwdriver loosing the screws on the
EV charger cover. Wire the cable to the
according terminal.
Left hole position
Right hole
position
Back of EV charger
perforating
as image
M6
*
8 bolts
Power cable
wiring diagram
Cable box with built
-in cable through EV
charger wiring position
lnsert power cord
into the top of
connection box
Three
-
phase
wiring diagram
Single
-
phase
wiring diagram
Installation instructions
Step-by-step installation instructions
(rear entry wiring)
Step
1
Drilling the holes according to the
instruction on the Position template
for di
ff
erent installation and wiring
ways.
Position
The bottom of the
⑨
positioning plate
is 1.2 m away (recommended), if the
EV charger is installed close to the
edge of the wall, the positioning plate
should be more than 0.5 m away from
the edge of the wall.
Drilling pilot holes
Step
2
Put the 8*40 socket head screws'
anchoring into the holes, and use the
screw driver make the 6pcs 8*40 Socket
head screws to fix the mounting braket
on the wall .
lnstall the Mounting braket
.
screwdriver
8
*
40
Expansion bolts
wall
≥
0
.
5M
~1
.
2M
Floor Level
Drill
Side of wall
The 6 pionts
on the
position plate
Hole for rearentry
(
not limited to the
wall only
)
Mounting
braket