P-10
P-09
In the box
①
②
③
④
⑤
⑥
⑦
⑧
⑨
⑩
NO.
1
2
3
4
5
6
7
8
9
10
11
12
Item
EV charger
Wire Box
Mounting braket
RFID Card (optional)
M32*1.5 cable gland
M6*8 Screws
8*40 Socket head screws and anchorings
8*40 Flat head screws and anchorings
Position Template
DLB box (optional)
Plastic lifter
Water-proof cover
Quantity
1
1
1
2
1
4
6
2
1
1
1
2
⑪
⑫
Installation instructions
Step-by-step installation instructions
(bottom entry wiring)
wall
≥
0
.
5M
~1
.
2M
Floor Level
Drill
Side of wall
The 6 pionts
on the position
plate
wall
screwdriver
Mounting
braket
8
*
40
Expansion bolts
Step
1
Position
Drilling pilot holes
The bottom of the
⑨
positioning plate
is 1.2 m away (recommended), if the EV
charger is installed close to the edge of
the wall, the positioning plate should
be more than 0.5 m away from the edge
of the wall.
Drilling the holes according to the
instruction on the Position template
for di
ff
erent installation and wiring
ways.
Step
2
lnstall the Mounting braket
Put the 8*40 Socket head screws' anchoring
into the holes, and use the screw driver
make the 6pcs 8*40 Socket head screws to
fix the Mounting braket on the wall .