![Zippkits VBox 2013 Edition Deep Vee Sport Crackerbox Building Instructions Download Page 28](http://html1.mh-extra.com/html/zippkits/vbox-2013-edition-deep-vee-sport-crackerbox/vbox-2013-edition-deep-vee-sport-crackerbox_building-instructions_3812149028.webp)
28
Set the rudder servo in the radio box with a
piece of 1/8 scrap ply as a shim under the
servo. Do not glue this. It is there to keep the
servo off the floor of the box for mounting.
Make sure that the servo assembly is near the
rudder servo hole in the radio box (the hole that
is higher on the box).
Use CA or epoxy to glue the servo mounts to
the side of the radio box.
Space the mount about ¼ inch forward of the
rear wall.
Repeat for the throttle servo. It is mounted in
front of the rudder servo and also about ¼ inch
back from the front wall.
Don’t forget to put the 1/8 scrap spacer under
the throttle servo.
When cured, flip the box over and mark for
mounting holes.
We made the holes 1 inch from each end, and
1/8 inch in.
Drill the radio box lip with a 1/16 bit.
Put the box in place on the ¼ inch rails about ¼
inch behind bulkhead 4.
Be sure that the box is centered on the rails and
drill into the rails using the holes in the box as
your guide.
Secure the box with 4 #2x1/2 inch screws (not
included).
Rudder servo in place.
Throttle servo added.
Radio box screwed in place.
Summary of Contents for VBox 2013 Edition Deep Vee Sport Crackerbox
Page 6: ...6...