15
Don’t clamp this area until last. Then clamp carefully.
Clamps in rear.
Transom clamped in place.
Clamp thoroughly, but be careful not to distort
the chines.
Allow to cure at least 2 hours.
Using a new mixing container and applicator, do
the other side. Be sure to test fit again. You will
have to trim the front tip of the first side, so the
second side fits.
Allow to cure at least 3 hours.
Use whatever you need to hold things together.
After the side sheeting has cured, sand the rear
of BH 5. Sand any of the engine rails that
protrude.
Use 30 minute epoxy to attach the transom to
BH 5.
The transom should be flush top and bottom.
Any overhang should be at the sides.
Clamp and allow to cure.
Bottom Sheeting
When the glue is fully cured on the side
sheeting, sand the side sheeting to match the
angle and contour of the chines and bulkheads.
Summary of Contents for VBox 2013 Edition Deep Vee Sport Crackerbox
Page 6: ...6...