![background image](http://html1.mh-extra.com/html/zippkits/g30/g30_manual_3806551006.webp)
6
Once everything cures, let's finish up these sponsons!
ZippCut the top and bottom of each sponson.
No need to squeeze anymore since the templates are
glued in place now.
Sand the top and bottom of each sponson so that the
inside and outside sheets are beveled.
We used 80 grit paper on a block for this.
We want a flat, smooth surface for the sheeting to bond.
Sand the back of the sponson so that it is flush and square
with the inside and outside, and flat.
Glue the bottom (BOTT) in place. Let the bottom
overhang 1/8 inch at the rear by aligning the etched line
with the back of the foam sponson.
The bottom sheet should be the only one to overhang at
the rear.
Allow an even overhang all around the bottom sheet.
Use tape tightly to hold the bottom sheet in place.
Repeat on the other sponson.
Double check that the etched line is at the back edge of
the foam, and you have some overhang all around.
Allow to cure.
Summary of Contents for G30
Page 1: ...1 G30 Outboard Tunnel Hull For 21 Nitro or 4S electric Length 30 5 inches Beam 11 5 inches...
Page 24: ...24...
Page 25: ...25...