802149UK Celsius residential - Installation instructions -Jan 2016 v2.03
Page 3 of 28
Index
HydroTap
®
G4 specifications
Installation check list ....................................................................................................................4
General product features .............................................................................................................5
Important safety instructions ........................................................................................................6
Warnings and regulatory information ...........................................................................................7
Major components and accessories .............................................................................................8
Technical specification .................................................................................................................9
Before installation and site requirements .....................................................................................10
Installation instructions
Step 1 -
Measure and cut all the tap holes before fitting the taps.
Section 1 - Celsius tap installation.
1.1 - Tools, hole positioning and hole size .......................................................................11
1.2 - Chilled spa mixed hot & cold tap installation ................................................12
1.3 - Chilled (or boiling) + mixed hot & cold tap installation .............................................13
Step
2 -
Check for adequate ventilation.
Section 2 - Ventilation.
2.1 - Ventilation on all models ...........................................................................................14
Step 3
- Mount the external filter / softener (if required)
3.1 - Mounting the filter head and cartridge installation ....................................................15
3.2 - Cartridge installation and flush ..................................................................................15
Step 4 -
Fit the CO
2
gas cylinder
Section 4 - CO
2
cylinder and regulator
4.1 - Connect, secure and test the CO
2
cylinder ...............................................................16-17
Step 5
- Install the Command-Centre
TM
.
Section 5 - Command-Centre
TM
installation
5.1- 5.2 Check the external bypass valve setting & Mains water supply hose ..................18
5.3- Boiling, and mixed hot and cold models ....................................................................19
5.4- Chilled and mixed hot and cold models ....................................................................20
5.5- Chilled and sparkling and mixed hot and cold models ..............................................21
Step 6
Commission the HydroTap
®
G4 Celsius
Section 6 - Commissioning
6.1- CO
2
purge ..................................................................................................................22
6.2- Filter flush ..................................................................................................................22
6.3- Boiling calibration .......................................................................................................23
Trouble shooting
Trouble shooting table ..................................................................................................................24
End of life disposal .......................................................................................................................25
Warranty .......................................................................................................................................26
Contact details .............................................................................................................................28