Page 10 of 28
802149UK Celsius residential - Installation instructions -Jan 2016 v2.03
Before installing ensure that the following have been
provided at the installation site
•
Review all the technical specifications.
•
Ensure the under counter can support the product weight when full of
water (allow an extra 2.5- 3.0 kg when full).
•
Sufficient space in the cupboard to install all of the Command-Centre
TM
plus related hardware in accordance with these installation instructions.
Refer to technical specification for dimensions. Make allowance for
a water softener if required. Refer to sections 3 to 5 for installation
instructions.
•
For all Celsius residential models a single 220-240V AC, 13A socket will
be required.
•
The Command-Centre
TM
must be installed in accordance with IEE
regulations. See Technical specification, page 9 for power ratings.
Note
Check all cable and hose lengths against inlet /outlet
positions before proceeding (See section 5 for general layout).
•
A potable water supply connection with isolating valve inside the
cupboard within reach of the braided hoses and positioned so that the
connection point and the stop cock will not be obstructed when the
Command-Centre
TM
is installed.
•
For mains pressure Celsius taps an external hot and cold water supply
will be required.
•
If an external filtration or water softening device is required, then it is
important to allow extra space for these items.
•
A potable cold water supply with a minimum working pressure of:
(see min / max water supply pressure on page 9).
•
If pressure is likely to exceed 0.7 MPa (7 bar), install a 0.35 MPa (3.5
bar) pressure limiting valve.
•
The appliance must be placed with its base in a horizontal position.
IMPORTANT!
Do not proceed with the installation if these requirements are
not met.
Before installation and site requirements