![Zip Celsius HydroTap G4 range Installation Instructions Manual Download Page 23](http://html1.mh-extra.com/html/zip/celsius-hydrotap-g4-range/celsius-hydrotap-g4-range_installation-instructions-manual_3801321023.webp)
802149UK Celsius residential - Installation instructions -Jan 2016 v2.03
Page 23 of 28
Commissioning
•
Press the [Calibrate] button and the system will
commence the boiling calibration procedure.
This will take approx 5-6 minutes.
• Press [START] / [STOP] button to start and stop the filter
flush.
• Open the flush stop cock.
• Allow at least 10 litres of water to flush through the filter.
• Once the filter flush is finished, close the stop cock then
press [STOP] to end filter flush mode.
• Press [NEXT] for the boiling calibration screen (boiling
models).
OPEN Position
CLOSED Position
ON
OFF
Filter flush menu
Stop cock
operation
6.3 - Boiling calibration
(for boiling models)
The HydroTap
®
G4 Celsius is equipped with a self-calibrating program to adjust for altitude. On start up, the
controls take the system through a calibration process. Once this mode is complete the system reverts back
to normal operation.
Prepare filter flush as per instructions
and press START
03:01 PM, TUE 12, Feb 2013
Boiling
Zip
START
STOP
NEXT
Boiling