INSTALLATION AND OPERATING INSTRUCTIONS:
2-jaw parallel gripper, hybrid, HRC-04 series
16
DDOC00269 / d
EN / 3/31/2020
Zimmer GmbH
●
Im Salmenkopf 5
●
77866 Rheinau, Germany
●
+49 7844 9138 0
●
+49 7844 9138 80
●
www.zimmer-group.com
7.3.2 Installing the pneumatic system
►
Connect the power supply line to the gripper and the safety
valve.
CAUTION:
The operating pressure must not exceed the specified value!
You can find the operating pressure in the technical data sheet on our website.
A safety valve must be used to limit the operating pressure.
►
Higher operating pressure causes higher forces.
►
Risk of injury!
7.3.3 Installing the “IO-Link“
PIN assignment of the power supply line:
PIN
Color
Function
Explanation
1
Brown
24 V DC Power supply for IO-Link communication
2
White
Ac 24 V
DC
Actuator supply voltage
3
Blue
GND sensor
Sensor 0 V DC supply voltage
4
Black
C/Q
IO-Link communication
5
Gray
GND actuator
Actuator 0 V DC supply voltage
The following steps must be carried out for commissioning or installation of the gripper with IO-Link:
• Connect the gripper to the IO-Link master.
• Secure the voltage supply.
►
For Port Class A, additional power supply via Y-cable.
7.4 Static charge
The movement of the gripper jaws create low voltages as a result of static charging. These charges cannot be dis-
sipated if the gripper is installed on an insulated surface and discharge is also not possible through the workpiece.
NOTICE:
Non-compliance may result in property damage
Grounding the gripper attachment / gripper jaws is recommended if ESD-sensitive parts come into cont-
act with the gripper.
7.5 Heat dissipation
In the event of high ambient temperatures, the gripper has to be installed on heat-dissipating materials.