background image

INFINITY 8 INSTALLATION MANUAL 

Approved Document No. GLT-201-7-1 

 

PAGE 18 

Issue: 1.6      Author:  NRPJ          Date: 27/7/2012 

13. ENGINEER OPTIONS (8 WAY CONFIG DIP SWITCH) 

The Infinity FCP has the following configuration options: 

 

 

 

Switch 1 ON = Compatibility Mode – use if Fyreye II Detectors are NOT used 

Switch 2 ON = Zone 2 non latching 

Switch 3 ON = Sounder circuit 3 active giving a power output 

Switch 4 ON = Sounder circuit 4 active giving a power output 

Switch 5 ON = 

DUTCH MARKET ONLY 

Switch 6 ON = Fault relay activates on a fire condition (Giving 2 fire relays) 

Switch 8 ON = Makes the last zone on the panel a call point zone (alarms from that zone not delayed) 

Note: The above options my not comply with local regulations. Please check with the relevant codes of practice in your region. 

 

 

0086 

 

Zeta Alarm Systems by GLT Exports Ltd,  

72-78 Morfa Road, Swansea SA1 2EN 

 

12 

 

0086-CPD-575041 

 
 

EN54-2:1997+A1:2002 + A2: 2006 
EN54-4:1997+A1:2002 + A2: 2006 

 
 

Control and indicating equipment for fire detection and fire 

alarm systems for buildings 

 

Infinity Conventional Fire Panel 

IN1, IN2, IN4, IN6, IN8 

 

Provided options: 

 

Output to fire alarm devices 

Delays to outputs 

Test Condition 

 

Other Technical Data: See Doc: “Infinity 8 Product file” 

 held by the manufacturer 

 

 

Summary of Contents for INFINITY 8

Page 1: ...INFINITY 8 INSTALLATION MANUAL Approved Document No GLT 201 7 1 Issue 1 6 Author NRPJ Date 27 7 2012 FIRE ALARM CONTROL PANEL INSTALLATION MANUAL...

Page 2: ...S 5 FIELD DEVICE TERMINATION 5 1 TERMINATING THE DETECTION AND ALARM SOUNDER CIRCUITS 5 2 AUXILIARY OUTPUT TERMINATIONS 6 SOUNDER ACTIVATION DELAY 6 1 DECIDING TO USE A DELAY 6 2 TO SET A DELAY 6 3 WI...

Page 3: ...wer failure It has the ability to disable any zone or the sounder circuits It has a one man test mode which resets the Zone in test after 5 seconds EN54 option with requirements It has a sounder delay...

Page 4: ...taller Engineer Open enclosure Connect wiring during install Battery check during Maintenance Set configuration switches 4 Authorised Service Engineer Open enclosure PC programming software Update pan...

Page 5: ...d mechanical protection such as a conduit 2 2 MAINS WIRING RECOMMENDATIONS The Mains supply to the FACP is fixed wiring using Fire resisting 3 core cable Between 1 mm and 2 5mm or a suitable 3 conduct...

Page 6: ...of old mechanical bell or a relay are used then a diode will have to be placed in line with the device to enable fault monitoring They may also need a back EMF protection diode 2 5 AUXILIARY OUTPUT W...

Page 7: ...AL Approved Document No GLT 201 7 1 PAGE 6 Issue 1 6 Author NRPJ Date 27 7 2012 The termination for the above inputs must be as indicated on the main PCB See page 15 The Earthing of the cable screens...

Page 8: ...x If a grommet is removed fill the hole with a brass cable gland If any knockout is removed but subsequently not used it should be covered up The 230Va c Mains cable must be fed into the enclosure via...

Page 9: ...WER 4 1 CONNECTING THE MAINS POWER Figure 3 Power Supply PCB layout and Mains connection details Figure 3 4 2 CONNECTING THE BATTERIES Figure 4 Battery location and connection details CAUTION RISK OF...

Page 10: ...l screens should be fed through the gland to make electrical contact with it and be terminated at the brass earthing strip as shown below see Figure 6 For detailed detector and alarm circuit wiring di...

Page 11: ...he number with the keypad 0 minutes type nothing 9 minutes type 81 10 minutes type 82 Press 5 The panel will flash a confirmation of the selected delay 6 Press 3 times to exit access level 3 6 3 WIRIN...

Page 12: ...isable one zone at a time 1 Enter access code default 1245 and press 2 Press for 3 seconds 3 Type the number of the zone you want to disable If you wish to disable the sounders press 4 Press to disabl...

Page 13: ...not in test mode at this point 4 Press to start test mode The Zone test LEDs will be flashing with a pattern 12 flashes then a pause repeated The zone is now in test mode 5 To set a different zone int...

Page 14: ...ase that is not making the connection c A short circuit on a zone could be caused by the end of line diode being fitted backwards d Check that the detectors are compatible with this FACP Note that som...

Page 15: ...nect the earth screens one at a time to determine the problem line Note connecting other equipment e g an oscilloscope to the panel can give an earth fault 9 5 SOUNDER FAULTS Similar to the zone fault...

Page 16: ...00005 Amp 50 A Optical Detector 0 0001 Amp 100 A Typical Example A system comprises of 20 ionisation detectors 14 bells and the required standby is 24 hours It will need to operate in alarm for hour...

Page 17: ...bells 10 SND 2 Connect to sounder circuit 2 sirens bells 11 SND 3 Connect to sounder circuit 3 sirens bells 12 SND 4 Connect to sounder circuit 4 sirens bells 13 FAULT RELAY NC CM NO Normally powered...

Page 18: ...TAGE 22 5V DC NOMINAL SOUNDER ALARM OUTPUTS 2 x 150mA 24V DC 1 2 zone panel 4 x 150mA 24V DC 4 6 8 zone panel AUXILIARY FAULT OUTPUT 1 x RELAY SELV 1A MAX AUXILIARY FIRE OUTPUT 1 x RELAY SELV 1A MAX N...

Page 19: ...e condition Giving 2 fire relays Switch 8 ON Makes the last zone on the panel a call point zone alarms from that zone not delayed Note The above options my not comply with local regulations Please che...

Reviews: