1.6 DEFINITION OF ACCESS LEVELS ON THE INFINITY PANEL 

ACCESS LEVEL 

ACCESSED BY 

ACCESS METHOD 

FUNCTIONS ACCESSED 

General public 

Default state 

View panel 
Override delay (if used) 
LED test 

Responsible person 

Access code entered 

Start/stop sounders 
Silence buzzer 
Reset panel 
Enable/disable sections of system 
Test mode 

3a 

Installer/Engineer 

Access code entered & Installer password 

Set sounder delay time 

3b 

Installer/Engineer 

Open enclosure 

Connect wiring during install 
Battery check during Maintenance 
Set configuration switches 

Authorised Service 
Engineer 

Open enclosure & PC programming software  Update panel firmware 

1.7 FUNCTIONS REQUIRED BY EUROPEAN STANDARD EN 54 PART 2 

The Premier Quatro fire alarm control panel provides the following mandatory and optional functions as prescribed by the 
European standard EN 54 Part 2. 

(a) Mandatory Functions 

The mandatory functions and corresponding indications provided by this panel are: 

 

fire alarm 

 

fault warning 

 

disabled, 

 

quiescent  

(b) Optional Functions 

The options with requirements provided by this panel are: 

 

output to fire alarm devices (i.e. sounders) 

 

delays to outputs 

 

Test Mode 

Summary of Contents for INFINITY 8

Page 1: ...INFINITY 8 INSTALLATION MANUAL Approved Document No GLT 201 7 1 Issue 1 6 Author NRPJ Date 27 7 2012 FIRE ALARM CONTROL PANEL INSTALLATION MANUAL...

Page 2: ...S 5 FIELD DEVICE TERMINATION 5 1 TERMINATING THE DETECTION AND ALARM SOUNDER CIRCUITS 5 2 AUXILIARY OUTPUT TERMINATIONS 6 SOUNDER ACTIVATION DELAY 6 1 DECIDING TO USE A DELAY 6 2 TO SET A DELAY 6 3 WI...

Page 3: ...wer failure It has the ability to disable any zone or the sounder circuits It has a one man test mode which resets the Zone in test after 5 seconds EN54 option with requirements It has a sounder delay...

Page 4: ...taller Engineer Open enclosure Connect wiring during install Battery check during Maintenance Set configuration switches 4 Authorised Service Engineer Open enclosure PC programming software Update pan...

Page 5: ...d mechanical protection such as a conduit 2 2 MAINS WIRING RECOMMENDATIONS The Mains supply to the FACP is fixed wiring using Fire resisting 3 core cable Between 1 mm and 2 5mm or a suitable 3 conduct...

Page 6: ...of old mechanical bell or a relay are used then a diode will have to be placed in line with the device to enable fault monitoring They may also need a back EMF protection diode 2 5 AUXILIARY OUTPUT W...

Page 7: ...AL Approved Document No GLT 201 7 1 PAGE 6 Issue 1 6 Author NRPJ Date 27 7 2012 The termination for the above inputs must be as indicated on the main PCB See page 15 The Earthing of the cable screens...

Page 8: ...x If a grommet is removed fill the hole with a brass cable gland If any knockout is removed but subsequently not used it should be covered up The 230Va c Mains cable must be fed into the enclosure via...

Page 9: ...WER 4 1 CONNECTING THE MAINS POWER Figure 3 Power Supply PCB layout and Mains connection details Figure 3 4 2 CONNECTING THE BATTERIES Figure 4 Battery location and connection details CAUTION RISK OF...

Page 10: ...l screens should be fed through the gland to make electrical contact with it and be terminated at the brass earthing strip as shown below see Figure 6 For detailed detector and alarm circuit wiring di...

Page 11: ...he number with the keypad 0 minutes type nothing 9 minutes type 81 10 minutes type 82 Press 5 The panel will flash a confirmation of the selected delay 6 Press 3 times to exit access level 3 6 3 WIRIN...

Page 12: ...isable one zone at a time 1 Enter access code default 1245 and press 2 Press for 3 seconds 3 Type the number of the zone you want to disable If you wish to disable the sounders press 4 Press to disabl...

Page 13: ...not in test mode at this point 4 Press to start test mode The Zone test LEDs will be flashing with a pattern 12 flashes then a pause repeated The zone is now in test mode 5 To set a different zone int...

Page 14: ...ase that is not making the connection c A short circuit on a zone could be caused by the end of line diode being fitted backwards d Check that the detectors are compatible with this FACP Note that som...

Page 15: ...nect the earth screens one at a time to determine the problem line Note connecting other equipment e g an oscilloscope to the panel can give an earth fault 9 5 SOUNDER FAULTS Similar to the zone fault...

Page 16: ...00005 Amp 50 A Optical Detector 0 0001 Amp 100 A Typical Example A system comprises of 20 ionisation detectors 14 bells and the required standby is 24 hours It will need to operate in alarm for hour...

Page 17: ...bells 10 SND 2 Connect to sounder circuit 2 sirens bells 11 SND 3 Connect to sounder circuit 3 sirens bells 12 SND 4 Connect to sounder circuit 4 sirens bells 13 FAULT RELAY NC CM NO Normally powered...

Page 18: ...TAGE 22 5V DC NOMINAL SOUNDER ALARM OUTPUTS 2 x 150mA 24V DC 1 2 zone panel 4 x 150mA 24V DC 4 6 8 zone panel AUXILIARY FAULT OUTPUT 1 x RELAY SELV 1A MAX AUXILIARY FIRE OUTPUT 1 x RELAY SELV 1A MAX N...

Page 19: ...e condition Giving 2 fire relays Switch 8 ON Makes the last zone on the panel a call point zone alarms from that zone not delayed Note The above options my not comply with local regulations Please che...