29
Operating slider, 5 buttons
Function, operation
Tilt up
Push tilt (2) and up (1) button in mentioned
order. f the load is to heavy or placed to far
back on the platform at tilt up, the overflow
valve opens.
Lift
Push up button (1) The platform lifts with
the same speed. If the load is to heavy the
over flow valve opens.
TILT
UP
2+1
LIFT
1
Tilt down
Push tilt (2) and down button (3) in
mentioned order. Also here gives the
constant flow valve the same speed
independent of the load.
TILT
DOWN
2+3
OPERATING INSTRUCTION
The tail lift can only be used by authorized
personnel.
DO NOT OVERLOAD THE TAIL LIFT!
After operating the tail lift
Lock the platform, turn of the maneuver
current in the cabin. Then the tail lift is
locked for unauthorized people. If the
platforms lock handle (if available) goes
heavily, the reason can be hose break at
the lift or tilt system.
Note!
Certain models of control units are
equipped with electric heating. The electric
heating is connected to the control current.
This will consume a little current from the
battery if the control current is switched on.
NOTE!
Always lift up the platform
against body floor before tilt
up/closing to transport position.
NOTE!
The hydraulic system is
protected against overload
at lift and tilt up of a built in
overflow valve. Notice that this
valve doesn’t protect at resting
or lowering. This may under
no circumstances be used for
overloading at lowering.
NOTE!
The platforms movement can
stop at anytime (if the push
buttons are released) and in
all positions because the push
buttons break the current to
respective function.
Summary of Contents for Z 15
Page 2: ......
Page 8: ...8...
Page 12: ...12 Possible notes and action taken Post installation check Pos Action taken Product approval...
Page 48: ...48...
Page 63: ...Notes...
Page 64: ......
Page 65: ......