9
Product approval
The following checks should be made to ensure that the tail lift has been correctly and
safely installed. These checks should be carried out by the installer after the tail lift and
vehicle have been prepared by him for regular operation.
Checks (2, 3, 4, 5, 9, 11 och 15 if available).
1.
Lift, tilt and lowering with fixed
control unit.
2.
Lift, tilt and lowering with other
control unit(s). Option.
3.
Function and possible worn bearings
on roll-stop. Option.
4.
Function of locking mechanism.
Option
5.
Sealing strips and horizontal guide.
Option.
Post installation checks
Summary of Contents for Z 15
Page 2: ......
Page 8: ...8...
Page 12: ...12 Possible notes and action taken Post installation check Pos Action taken Product approval...
Page 48: ...48...
Page 63: ...Notes...
Page 64: ......
Page 65: ......