Zenith Hydro Tap Installation and Operating Instructions - 81467 - February 2005

These Installation Instructions cover the entire Zenith HydroTap range. Use the
chart on the left to identify the model you are using:

Commercial and Domestic Models:

BC

= Boiling and Chilled, Filtered, Timer

BF = 

Boiling, Filtered

BD  = Boiling and Ambient Filtered
B    = Boiling only (unfiltered)
D    = Disabled Lever controls, (Optional order only)
HT

= Domestic Models (boiling only are unfiltered, boiling/chilled are filtered) 

Boiling Water Capacity:

100 = 100 cups in one hour   150 = 150 cups in one hour

Chilled  Water Capacity: (BC only)

125 = 125 glasses in one hour   175 = 175 glasses in one hour

Filtration:  (BC, BD and BF only)
Note:

The

Cup

measurement = 167mls, the 

Glass

measurement = 200mls.

Models covered by these instructions

Before installing ensure that the following have been provided at the
installation site:

Sufficient space in the cupboard to install the undersink unit in accordance
with these Installation Instructions. A table of dimensions is given below.

NOTE: Add 65mm to the Depth to the under-sink unit to allow for Water and Electrical connections

A water supply connection with isolating valve inside the cupboard within
reach of the 750 mm flexible connection and positioned so that the
connection point and the stop cock will not be obstructed when the
undersink unit is installed.

Power supply 220-240 Volt AC, for connection to the heater via a 10 amp
G.P.O.

Installation Requirements

BC

Model

100

Cups of

Boiling Water

per Hour

125

Glasses of

Chilled Water

per Hour

Frost Protection

If this appliance is located where the ambient air temperature could fall below 5ºC
when the heater is not in use, do not turn off the appliance electrically. This
safeguard does not offer the same protection to the connecting pipework and
fittings.

Installation Environment Considerations

This unit is intended for indoor use only and should never be installed outdoors
or exposed to the elements of nature. This unit must not be positioned in an
area that may be cleaned by a water jet. This unit must not be cleaned by a
water jet.

#

Section Heading

#

Section Heading

Read These Warnings First 

continued

Height

mm (inch)

Depth

mm (inch)

Weight empty

kg’s  lbs

Weight full 

kg’s  lbs

337 (13.2)

430 (16.9)

440 (17.3)

28  (61.7)

34.5 (76)

337 (13.2)

430 (16.9)

28  (61.7)

35 (77.1)

395 (15.5)

465 (18.3)

500 (19.6)

29.5  (65)

38 (83.7)

409 (16.1)

340 (13.3)

321 (12.6)

10   (22)

14 (30.8)

353 (13.8)

320 (12.5)

9.5  (20.9)

12 (26.4)

353 (13.8)

320 (12.5)

290 (11.4)

9  (19.8)

11.5 (25.3)

353 (13.8)

320 (12.5)

9  (19.8)

Width

mm (inch)

440 (17.3)

290 (11.4)

290 (11.4)

11.5 (25.3)

Model

BC & HT 60/85 

BC 100/125 

BC 150/175 

B 150 

B 100 

B 60 

BD 60 

Summary of Contents for HYDROTAP 30009

Page 1: ...droTap Filtered boiling and chilled drinking water for kitchens and tea rooms Commercial Models 30281 Zenith HydroTap BC150 175 30271 Zenith HydroTap BC100 125 37201 Zenith HydroTap B10OF 38201 Zenith...

Page 2: ...all models 7 Step E Testing and commissioning 7 Font Installation procedure 8 Operating the Tap 9 Cleaning 10 Replacing the Filter 10 Pull out Font Template pages a b c d Setting the Energy Saver Tim...

Page 3: ...e given in the table under the heading Installation Requirements Do not lift the unit by the doors Airflow The ambient temperatures this unit should operate within are 5 C 35 C Proper air circulation...

Page 4: ...750 mm flexible connection and positioned so that the connection point and the stop cock will not be obstructed when the undersink unit is installed Power supply 220 240 Volt AC for connection to the...

Page 5: ...lide it up to meet the All Thread and pass the All Thread through the center of the Spider Clamp 7 Hold the All Thread steady and re fit the 6mm nut to the All Thread using the tube spanner supplied i...

Page 6: ...essential Step C Connecting the tap Model BC and HT boiling chilled models Measure and trim the blue tube and connect it to the chilled water outlet located on the top front right hand side of the nde...

Page 7: ...e water to 95 C maintaining it at that temperature for a short stabilization period Once stabilized the element will cycle On bring the water to boiling point and hold it there for a short period The...

Page 8: ...e fixing nut withtheTube Spanner provided in the kit NOTE The All Thread is a floating component it locks into place once tension is applied by the fixing nut and washer 6 Tighten the securing pin so...

Page 9: ...he Blue lever allows dispensing of chilled water Pulling up the Blue lever allows the tap to operate in a no touch mode Water will flow for a maximum time of 15 seconds To reset return the handle to t...

Page 10: ...il it stops 4 Ease cartridge downwards to detach it from the filter head socket 5 Do not tilt the cartridge as dirty water may spill from it if tilted 6 Unpack replacement cartridge and write today s...

Page 11: ...ions section of this document Press either Mode or Mode button until Litres Filtered is displayed Press Adjust once and Reset Counter will be displayed press Adjust button once and Are You Sure will b...

Page 12: ...is the most effective for your installation Application of the fan is of paramount importance in situations where the cupboard space reaches temperatures greater than 35 C Boiling Water Safety Isolati...

Page 13: ...ust come out of OFF cycle Possible internal fault Excessive use unit refilling or chilling down to temperature Possible internal fault Check power supply Ensure power plug is correctly fitted and swit...

Page 14: ...tor kit BC150 175 17 Z90023 compressor kit BC150 175 7 Z90633 sensor probe kit 18 Z90639 fan motor kit BC100 125 8 Z90634 pump kit cold 18 Z90640 fan motor kit BC150 175 9 Z90622 PCB kit BC100 125 BC1...

Page 15: ...kit hot tank BC100 125 4 Z90617 gasket and elbow kit BC 150 175 16 Z90630 level sensor kit hot tank BC150 175 5 Z90579 overload kit 17 Z90186 loom overlad kit 6 Z90618 element 1500W kit 18 Z90187 loom...

Page 16: ...e Solenoid Kit 4 Z90658 Gasket and Elbow Kit BC 100 125 5 Z90579 Overload Kit 6 Z90618 Element 1500 watt Kit 7 Z90620 Sensor Probe Hot 8 Z90621 Pump Kit Hot 9 Z90689 PCB Kit Boiling Only 10 Z90624 Lea...

Page 17: ...Zenith Hydro Tap Installation and Operating Instructions 81467 February 2005 Page 17 of 20 Notes...

Page 18: ...Page 18 of 20 Zenith Hydro Tap Installation and Operating Instructions 81467 February 2005 Notes...

Page 19: ...Zenith Hydro Tap Installation and Operating Instructions 81467 February 2005 Page 19 of 20 Notes...

Page 20: ...osts are payable by the customer other than any mileage or travelling time charges incurred by a Zenith Service Provider or the cost of removal cartage and re installation of any component of the appl...

Reviews: