background image

Page 8 0f 20

Zenith Hydro Tap Installation and Operating Instructions - 81467 - February 2005

LARGE HOLE

1. Position the Font template (provided) on the bench area. Ensure the

position you select is within the length of the supply tube and USB cable
fixed to the Tap Head Assembly. These cannot be extended.

2. Check again for correct positioning.  The supply hoses must  have 

constant fall back to the tank assembly. Cut the holes as shown on
the template.

3. Once holes are cut, locate the Font base in position, from the underside,

lightly tighten the securing rod with the nut and washer provided.

4. Now take the Tap Head Assembly and remove the fixing nut, washer and

“Spider Clamp” from the “All Thread”. Apply a light smear of silicon
sealant to the underside of the black base ring, this will provide a water
tight seal against the Font base when clamped.

5. Feed the hoses and USB cable through the Font base, then through the

plastic spacer that sits under the font base but on the bench top, this
stops warping of the base plate. Ensure the Tap spout is directly centered
over the Font drain. Refit the “Spider Clamp”, nut and washer onto the “All
Thread”. Have all the supply tubes and USB cable located evenly between the 
Spider Clamp legs. When satisfied with the positioning, tighten the fixing nut 
with the Tube Spanner provided in the kit.

NOTE:  

The “All Thread” is a “floating” component, it locks into place once

tension is applied by the fixing nut and washer.

6. Tighten the securing pin so the Font base is flush with the bench top.

NOTE:

The fixing nut above the drain elbow can be loosened to correctly

position the direction of the elbow. Ensure when the re-positioning is
complete the nut is re-tightened to ensure a water tight seal.

7. Connect a drain hose (22mm ID) from the Font base outlet elbow to the

closest drain trap spigot available. If a spigot is not available use the snap
on spigot and worm drive clamps supplied in the kit.

8. Ensure the positioning of the snap-on spigot is on the “sink” side of the

trap and not the “waste” side. Once positioned, a hole (13mm ID) will
need to be drilled to provide waste access to the drain line. The snap-on
unit will require suitable sealant to keep it water tight against the waste
pipe. Finish by fitting the worm drive clamps tightly on either side of the 
spigot and fitting worm drive clamps to either end of the drain hose. The
drain hose from the Font must have constant fall

9. Connect the Tap head Assembly supply hoses and vent as per the instructions 

contained in the installation procedure section of this document.

Font installation procedure

Spider clamp

All-thread

Black ring

Tap assy

hole 38mm

Hole required for Font

recess 108mm

Fixing stud

Drain elbow

View from underside

Cut a 10mm

slot for stud 

Summary of Contents for HYDROTAP 30009

Page 1: ...droTap Filtered boiling and chilled drinking water for kitchens and tea rooms Commercial Models 30281 Zenith HydroTap BC150 175 30271 Zenith HydroTap BC100 125 37201 Zenith HydroTap B10OF 38201 Zenith...

Page 2: ...all models 7 Step E Testing and commissioning 7 Font Installation procedure 8 Operating the Tap 9 Cleaning 10 Replacing the Filter 10 Pull out Font Template pages a b c d Setting the Energy Saver Tim...

Page 3: ...e given in the table under the heading Installation Requirements Do not lift the unit by the doors Airflow The ambient temperatures this unit should operate within are 5 C 35 C Proper air circulation...

Page 4: ...750 mm flexible connection and positioned so that the connection point and the stop cock will not be obstructed when the undersink unit is installed Power supply 220 240 Volt AC for connection to the...

Page 5: ...lide it up to meet the All Thread and pass the All Thread through the center of the Spider Clamp 7 Hold the All Thread steady and re fit the 6mm nut to the All Thread using the tube spanner supplied i...

Page 6: ...essential Step C Connecting the tap Model BC and HT boiling chilled models Measure and trim the blue tube and connect it to the chilled water outlet located on the top front right hand side of the nde...

Page 7: ...e water to 95 C maintaining it at that temperature for a short stabilization period Once stabilized the element will cycle On bring the water to boiling point and hold it there for a short period The...

Page 8: ...e fixing nut withtheTube Spanner provided in the kit NOTE The All Thread is a floating component it locks into place once tension is applied by the fixing nut and washer 6 Tighten the securing pin so...

Page 9: ...he Blue lever allows dispensing of chilled water Pulling up the Blue lever allows the tap to operate in a no touch mode Water will flow for a maximum time of 15 seconds To reset return the handle to t...

Page 10: ...il it stops 4 Ease cartridge downwards to detach it from the filter head socket 5 Do not tilt the cartridge as dirty water may spill from it if tilted 6 Unpack replacement cartridge and write today s...

Page 11: ...ions section of this document Press either Mode or Mode button until Litres Filtered is displayed Press Adjust once and Reset Counter will be displayed press Adjust button once and Are You Sure will b...

Page 12: ...is the most effective for your installation Application of the fan is of paramount importance in situations where the cupboard space reaches temperatures greater than 35 C Boiling Water Safety Isolati...

Page 13: ...ust come out of OFF cycle Possible internal fault Excessive use unit refilling or chilling down to temperature Possible internal fault Check power supply Ensure power plug is correctly fitted and swit...

Page 14: ...tor kit BC150 175 17 Z90023 compressor kit BC150 175 7 Z90633 sensor probe kit 18 Z90639 fan motor kit BC100 125 8 Z90634 pump kit cold 18 Z90640 fan motor kit BC150 175 9 Z90622 PCB kit BC100 125 BC1...

Page 15: ...kit hot tank BC100 125 4 Z90617 gasket and elbow kit BC 150 175 16 Z90630 level sensor kit hot tank BC150 175 5 Z90579 overload kit 17 Z90186 loom overlad kit 6 Z90618 element 1500W kit 18 Z90187 loom...

Page 16: ...e Solenoid Kit 4 Z90658 Gasket and Elbow Kit BC 100 125 5 Z90579 Overload Kit 6 Z90618 Element 1500 watt Kit 7 Z90620 Sensor Probe Hot 8 Z90621 Pump Kit Hot 9 Z90689 PCB Kit Boiling Only 10 Z90624 Lea...

Page 17: ...Zenith Hydro Tap Installation and Operating Instructions 81467 February 2005 Page 17 of 20 Notes...

Page 18: ...Page 18 of 20 Zenith Hydro Tap Installation and Operating Instructions 81467 February 2005 Notes...

Page 19: ...Zenith Hydro Tap Installation and Operating Instructions 81467 February 2005 Page 19 of 20 Notes...

Page 20: ...osts are payable by the customer other than any mileage or travelling time charges incurred by a Zenith Service Provider or the cost of removal cartage and re installation of any component of the appl...

Reviews: