5. Single & Dual Cooling System Commissioning Steps
5.6 Start up Procedure – Dual Cooling
1.
ONLY once the condensers have been hardwired and copper piping been
connected can the cooling system be turned on.
2.
Insert cooling system (IEC) plugs (Orange cable) into:
3.
Plug Orange Cable (Labelled – Cooling system 1) into Permanent supply 1
4.
Plug Orange Cable (Labelled – Cooling system 2) into Permanent supply 2
5.
Ensure switchboard is powered and both the Cooling System RCD and Cooling
System are in the
ON position
6.
Start-up cooling system on remote located at the back door on left hand side.
7.
Press the
START button on the cooling system remote.
8.
Ensure temperature is set to 23° on cooling mode and FAN STRENGTH is on HIGH.
9.
Run both system together for 5 minutes – ensure both systems are operating.
10.
Pull out both plugs without turning cooling system off from the permanent supply
and plug into Cooling systems 1 & 2 outlets.
11.
One system will be operation following this step.
12.
Installation complete
()*+,#*-.#*'#/)-#*$)0-')11#'2*3%/*-.#*
-'30,/%--#'*3-*-.#*%05))'*+0%-6*78*-.#'#*
%,*309-.%0:*-)*;1)$<*,%:031,*;#-=##0*
-.#*+0%-*305*-.#*'#/)-#*$)0-')11#'2*
,+$.*3,*3*$+'-3%02*-.#*+0%-*=%11*0)-*
?)*0)-*5')>*-.#*'#/)-#*$)0-')11#'6*?)*
(.#*/3@%/+/*5%,-30$#*8)'*
$)//+0%$3-%)0*%,*3>>')@6*!/6
34!%+$**1.2%56**&.
)=*'3-#*,#--%0:6*
A3:#*BC
ADEF"GHI*)>#'3-%)06*
A3:#*B!
<1+=/">%?;-<@
7-*5%,>139,*-.#*$+''#0-*,#--%0:,6
4*
J70*-.%,*%11+,-'3-%)02*#3$.*,#$-%)0*%,*
,.)=0*=%-.*311*%-,*5%,>139,*)0*8)'*-.#*
>+'>),#*)8*#@>1303-%)06K
A9B(9,4A:,9%
"CD6+*#$.*%56**&.+
7-*$.30:#,*-.#*-#/>#'3-+'#*,#--%0:6
4*
A3:#*BL
7!E733%56**&.
A'#,,*-.%,*;+--)0*)0$#*-)*,-3'-*
4*
)>#'3-%)06
A'#,,*)0$#*3:3%0*-)*,-)>*%-6*
A3:#*BB
3)&.*%F&G$)
D>#0*-.#*8')0-*$)&#'6*
4*
A3:#*M
NFO(*AHPA*/)5#1
O"QCRLOC
QDDI7ST*DSIU*/)5#1
O"QCRLOBV
12/8/2011 9:18:00 PM
Coo
ling
S
ys
te
m
1
Coo
ling
S
ys
te
m
2
Pe
rm
anen
t S
upp
ly
1
Pe
rm
anen
t S
upp
ly
2
()*+,#*-.#*'#/)-#*$)0-')11#'2*3%/*-.#*
-'30,/%--#'*3-*-.#*%05))'*+0%-6*78*-.#'#*
%,*309-.%0:*-)*;1)$<*,%:031,*;#-=##0*
-.#*+0%-*305*-.#*'#/)-#*$)0-')11#'2*
,+$.*3,*3*$+'-3%02*-.#*+0%-*=%11*0)-*
?)*0)-*5')>*-.#*'#/)-#*$)0-')11#'6*?)*
(.#*/3@%/+/*5%,-30$#*8)'*
$)//+0%$3-%)0*%,*3>>')@6*!/6
34!%+$**1.2%56**&.
)=*'3-#*,#--%0:6*
A3:#*BC
ADEF"GHI*)>#'3-%)06*
A3:#*B!
<1+=/">%?;-<@
7-*5%,>139,*-.#*$+''#0-*,#--%0:,6
4*
J70*-.%,*%11+,-'3-%)02*#3$.*,#$-%)0*%,*
,.)=0*=%-.*311*%-,*5%,>139,*)0*8)'*-.#*
>+'>),#*)8*#@>1303-%)06K
A9B(9,4A:,9%
"CD6+*#$.*%56**&.+
7-*$.30:#,*-.#*-#/>#'3-+'#*,#--%0:6
4*
A3:#*BL
7!E733%56**&.
A'#,,*-.%,*;+--)0*)0$#*-)*,-3'-*
4*
)>#'3-%)06
A'#,,*)0$#*3:3%0*-)*,-)>*%-6*
A3:#*BB
3)&.*%F&G$)
D>#0*-.#*8')0-*$)&#'6*
4*
A3:#*M
NFO(*AHPA*/)5#1
O"QCRLOC
QDDI7ST*DSIU*/)5#1
O"QCRLOBV
12/8/2011 9:18:00 PM
Coo
ling
S
ys
te
m
1
Coo
ling
S
ys
te
m
2
Pe
rm
anen
t S
upp
ly
1
Pe
rm
anen
t S
upp
ly
2
Cooling Remote