background image

7. Pyrorack Commissioning & User Guide

IMPORTANT

For effective and safe installation follow the steps in the next few slides.

Please note: Accidental discharge will occur if this guide is not followed step by step.

For effective and safe installation follow the steps below See cannister connection quick guide.

Please note: Accidental discharge will occur if this guide is not followed step by step

Please print, laminate & stick near your Zella Pro for all to see the next 2 slides.

Summary of Contents for Pro 12

Page 1: ...zelladc com Installation Manual Modular Micro Data Centre Solutions...

Page 2: ...ntroduction 3 2 Safety Instructions 4 3 Power Connection 5 4 Access Control 8 5 Single Dual Cooling System Commissioning Steps 9 6 PDView Access 15 7 Pyrorack Commissioning User Guide 18 8 Start up Re...

Page 3: ...ly reducing operational and energy costs by 30 60 and on premise IT footprint Moreover it allows for portability and can be moved from location to location and expanded to a set of modular data centre...

Page 4: ...ance Important safety note z Caution needs to be taken when removing the side panels of the Micro Data Centre in particular when dealing with the 38U as they are heavy We recommend a 2 man lift when r...

Page 5: ...MEND THAT INSTALLATION SHOULD ONLY BE CARRIED OUT BY SUITABLY QUALIFIED ELECTRICAL CONTRACTOR WITH THE NECESSARY TRAINING 3 2 Switchboard Operation Following the connection to mains power DEPENDING ON...

Page 6: ...3 Power Connection 3 3 Power Supply diagram to PDU switchboard Non monitored sockets UPS Power Cooling system Cooling system RCD Mains power...

Page 7: ...3 Power Connection 3 4 Switchboard layout Front View Rear View...

Page 8: ...ened by the push button located inside the Zella Pro See user manual for programming options Use card reader until you are ready for biometric access mode 4 3 L E D Key Pad Operation The default code...

Page 9: ...of the building or on the roof 5 2 Commissioning Once the Zella Pro has been positioned in its proposed location and connected to power the air conditioning contractor can commission the cooling syste...

Page 10: ...Pro base mounted switchboard and orange cooling system plug is unplugged from rear of switchboard Grey cable termination in condenser supplies power back to the Zella Pro 4 core cable 1 Brown 2 Blue...

Page 11: ...iring cont PLEASE NOTE WHEN PLUGGING THE CABLE CONNECTORS YOU SHOULD HEAR A CLICK TO CONFIRM CONTACT AFTER INSERTING THE PLUG ENSURE BOTH ORANGE AND GREY CABLES ARE LOCKED BY TURNING THE YELLOW DISK O...

Page 12: ...is available on the market Please note Pipe size is 9 5mm for cooling capacity 2kw up to 3 5kw See enclosed manual with condenser Gas side Liquid side Gas pipe thermal insulation Liquid pipe thermal...

Page 13: ...complete 0 11 2 3 30 3 05 0 6 78 309 0 1 031 0 0 305 0 11 2 3 3 3 02 0 11 0 0 5 0 11 6 3 5 30 8 0 3 0 3 6 6 34 1 2 56 3 0 6 A3 BC ADEF GHI 3 06 A3 B 1 7 5 139 0 0 6 4 J70 11 3 02 3 0 0 311 5 139 0 8...

Page 14: ...turning cooling system off from the permanent supply and plug into Cooling systems 1 2 outlets 11 One system will be operation following this step 12 Installation complete 0 11 2 3 0 3 05 0 6 78 309 0...

Page 15: ...admin b Password zellabox c Accept the terms of use check box d Once connected to the PDU the following similar image should appear 4 Access the network icon located at the bottom of the screen If you...

Page 16: ...enter Use the following to access Login admin Password zellabox Accept the terms of use check box OPTION 3 To access the Zella Pro PDU through a network switch or something similar follow these steps...

Page 17: ...sign the desired IP address to the PDU by referring to OPTION 1 above Plug network cable switch directly into the PDU Access the PDU through local Display If you have any questions please contact Zell...

Page 18: ...cidental discharge will occur if this guide is not followed step by step For effective and safe installation follow the steps below See cannister connection quick guide Please note Accidental discharg...

Page 19: ...r to the Pyrorack by inserting 7 the plug and tightening the washer 8 Reinsert the canister back into the Pyroack 9 Place the Pyrorack into position top of the Zella Pro 10 7 3 Commissioning Steps 1 F...

Page 20: ...d 2 by pressing the isolate zones buttons located on the front panel 3 A beeping sound will continue intermittently as a reminder 4 Once you have completed work within the MDC and you are ready to clo...

Page 21: ...Follow commissioning steps MAG UNIT FUSE F3 500mA TL D CONN MALE J2 D CONN FEMALE J1 BATTERY FUSE F4 500mA TL MANS FUSE F5 500mA TL 7 7 Important tips Before working within the Zella Pro ALWAYS ensur...

Page 22: ...alled z Switch UPS switch to the ON position z Switch all remaining switches to the ON position 2 Follow Pyrorack Commissioning steps from the installation manual 3 Populate the Micro Data Centre with...

Page 23: ...error Scalability as needed Energy and noise efficiency Local storage fast processing Over a decade ago Zella DC pioneered the micro data centre Since then our next generation server rooms have been p...

Reviews: