EN - 9
Return air
Supply air
Outside air
Exhaust air
ComfoAir 200 - Right
2.6.4 Connection of the condensation drain
The ComfoAir is fitted with an enthalpy exchanger the
humidity from the extracted air is partly transferred to
the fresh supply air. In this case you delay the process
of drying
out the house in dry winter months, additionally there is
no condensate that must be drained from the ComfoAir.
Therefore a condensation drain is not necessary with an
enthalpy exchanger.
Ensure that the condensation drain is sealed.
This prevents the ComfoAir from sucking in
any leakage air.
The condensation drain can be sealed with a standard
plug.
2.7 Commissioning the ComfoAir
After installation, the ComfoAir must be commissioned.
This can be done via the P menus on the digital operat-
ing device. These P menus can be used to enter vari-
ous settings (ventilation programmes, in particular) for
the ComfoAir. An overview of the available P menus is
given below:
Menu
Options
P1
Reading statuses (from menu P2)
P2
Setting time delays
P3
Setting and reading the ventilation levels
P4
Setting and reading the temperatures
P5
Setting additional programmes
P6
Setting additional programmes
P7
Reading and resetting malfunctions (and system
information)
P8
Setting the RF input and analogue
inputs (0-10V)
P9
Reading statuses (from menu P5 and P6)
P menus P1, P2 and P9 can be accessed by the user,
mainly to read statuses and set time delays. The remain-
ing P menus P3 to P8 are intended
solely
for the installer.
The ComfoAir's bypass valve will not work for
the first 4 minutes after a power cut unless the
programme mode is activated.