
SECTION 2: SYSTEM INSTALLATION
YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, PA • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
NJEX ZEO Version 04/13/2021
Page 15
Standard System Lifting and Mounting
The cabinets are provided with three 1.25” (31.8mm) lifting eyes. The cabinet should be lifted
from these lifting eyes with a suitable device. The lifting eyes can be removed after the system
is installed if so desired.
WARNING: While lifting, all personnel should stand clear of the cabinet. Keep all hands,
fingers, etc. free from under the cabinet while setting down. Lifting must be performed
with an adequate lifting system.
Bolt down the system enclosure to a concrete slab using the four mounting slots (5/8
”) provided
in the bottom of each leg of the enclosure. Recommended bolt or stud size for mounting the
enclosure is 1/2”. See Figure 3 for mounting dimensions. Cabinets will be supplied with either
tapered or straight legs depending on the application. Please see the model code of the NJEX
ZEO system to determine which leg type your system has. If you have additional questions,
contact your local YZ Systems sales representative.
NOTE: It is recommended to leave a 2 foot (0.6 meter) clearance around the NJEX ZEO
cabinet to provide ample access when maintenance is required.
WARNING: If the cabinets are installed within a skid system, do not lift the assembled
skids by the cabinet lifting eyes. The cabinet lifting eyes are sized to lift the cabinet and
its contents only.